Several corrections should be made to the original paper. The errors include corrections to Eqs. (8) and (9). Furthermore, a mistake in the calculation of the uncertainty related to random measurement error, COVe;Di , requires corrections to Table 4 and to Figs. 7, 9, and 10. The corrections of the calculation results are inconsequential and do not alter the conclusions of the published paper. The corrections are given subsequently.Corrections to Section “Project Description and Site Characterization” [Eqs. (8a), (8b), and (9)] In Eqs. (8) and (9), the braces defining the measured or evaluated property, δi, and transformation factor, Ci, are incorrectly stated. The correct equations are provided as follows: (Formula Presented) (Table Presented) Thus, when α varies between 1.0 and 0.6, γM=η ranges from 1.16 to 1.29.
QC 20200616