Adapting the spillway for updated design flood at Stenkullafors dam, North Sweden
KTH, Skolan för arkitektur och samhällsbyggnad (ABE), Byggvetenskap, Vattendragsteknik. (Vattenbyggnadshydraulik)ORCID-id: 0000-0002-4242-3824
Vattenfall AB.
2009 (engelsk)Konferansepaper, Publicerat paper (Fagfellevurdert)
Abstract [en]

New Swedish design-flood and dam-safety guidelines require a higher level of structural and hydraulic safety of the existing dams in the country. The guidelines initiated a review of each river to find good solutions – combinations of retention of water and increased spillway capacity. To comply with the guidelines, a dam-safety program undergoes in the country to rebuild a large number of dams to improve their safety – for higher design floods and also in many other respects. Technical solutions include dam reinforcement, spillway capacity increase and temporary storage of water in large reservoirs. Stenkullafors has a spillway with two gated overflow openings. Its revised design flood is 40 % higher than its existing spillway capacity. Based on a cost-benefit analysis, modifying one spillway opening to a lower crest was chosen as the main measure to cope with the flow. Through hydraulic model tests, the spillway crest profile was optimized so as to achieve the required capacity on one hand and to minimize the cost of the spillway crest and the new gate on the other. The sill elevation in the right spillway opening was lowered by 4.3 m and a new higher tainter gate was installed. The dam has now been rebuilt to higher safety level. This paper addresses hydraulic model tests and the risk of flood occurrence during the construction time. Also, the construction process and difficulties that were encountered are described. Other engineering measures are strengthening of the dam body, new erosion protection on upstream slope, energy dissipater and channel downstream.

sted, utgiver, år, opplag, sider
2009.
Emneord [en]
Stenkullafors, spillway, discharge capacity, design flood, model tests
HSV kategori
Identifikatorer
URN: urn:nbn:se:kth:diva-179782OAI: oai:DiVA.org:kth-179782DiVA, id: diva2:889447
Konferanse
Intl. Conf. Dam Safety Management, Oct. 2008, Nanjing, China
Merknad

QC 20160107

Tilgjengelig fra: 2015-12-25 Laget: 2015-12-25 Sist oppdatert: 2022-09-13bibliografisk kontrollert

Open Access i DiVA

Fulltekst mangler i DiVA

Søk i DiVA

Av forfatter/redaktør
Yang, James
Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric

urn-nbn
Totalt: 99 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf