Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Air Gap Method: drying of a concrete slab on ground construction
KTH, Skolan för arkitektur och samhällsbyggnad (ABE), Byggvetenskap, Byggnadsteknik.
KTH, Skolan för arkitektur och samhällsbyggnad (ABE), Byggvetenskap, Byggnadsteknik.ORCID-id: 0000-0001-7073-2600
2010 (engelsk)Inngår i: Structural Survey, ISSN 0263-080X, E-ISSN 1758-6844, Vol. 28, nr 4, s. 281-299Artikkel i tidsskrift (Fagfellevurdert) Published
Abstract [en]

Purpose – The purpose of this paper is to report on a study which has been carried out on a timber floor construction above a ground-supported concrete slab, which was used in small detached houses built in Sweden during the period 1960-1990. This method of building has turned out to be a risky construction nowadays, but there are 800,000 houses built this way in Sweden.

Design/methodology/approach – By using the patented Air Gap Method inside building constructions, harmful water can be dried out. The method ventilates air gaps inside walls and floors with an air flow driven by thermal buoyancy caused by a heating cable in the vertical air gaps. The drying out process has been studied both by measuring the moisture level in the slab and also by measuring the humidity transport and comparing this with air flow measurements.

Findings – The paper shows that the Air Gap Method manages to dry out water from both the slab and the overlaying wooden construction. The study shows also that the relative humidity (RH) levels in the air space below the floor are reduced in a significant way, thus minimizing mould growth. It is also shown that a thin layer of concrete upon floor beams prevents mould to grow even in a humid situation.

Research limitations/implications – The research reported in this paper is only concerned with timber-framed small detached houses. Similar studies of apartment buildings are ongoing.

Practical implications – The Air Gap Method can thus be useful in the context of renovating a water damaged house of this type built during this 30-year period. The method provides a possibility of drying out such damage without a separate drying period. The inhabitants could therefore be able to use a renovated water-damaged kitchen six/eight weeks earlier compared to ordinary building methods.

Originality/value – The paper is useful because it provides better understanding of the mechanism of RH inside a building construction and how this parameter could be lowered. The paper is also useful in the context of renovating water-damaged small detached houses built by the risky method of construction used in the last decades of the twentieth century.

sted, utgiver, år, opplag, sider
Emerald Group Publishing Limited, 2010. Vol. 28, nr 4, s. 281-299
Emneord [en]
concrete slabs, construction materials, Drying, Property, Structural timber, Sweden
HSV kategori
Identifikatorer
URN: urn:nbn:se:kth:diva-102866DOI: 10.1108/02630801011070984Scopus ID: 2-s2.0-77956554861OAI: oai:DiVA.org:kth-102866DiVA, id: diva2:557140
Merknad

QC 20120927

Tilgjengelig fra: 2012-09-27 Laget: 2012-09-27 Sist oppdatert: 2017-12-07bibliografisk kontrollert
Inngår i avhandling
1. Air Gap Method: Air-Gaps in Building Construction to avoid Dampness & Mould
Åpne denne publikasjonen i ny fane eller vindu >>Air Gap Method: Air-Gaps in Building Construction to avoid Dampness & Mould
2012 (engelsk)Doktoravhandling, med artikler (Annet vitenskapelig)
sted, utgiver, år, opplag, sider
Stockholm: KTH Royal Institute of Technology, 2012. s. 55
Emneord
humidity, air gaps, water damage, convection, building, construction
HSV kategori
Identifikatorer
urn:nbn:se:kth:diva-102873 (URN)978-91-7501-485-2 (ISBN)
Disputas
2012-10-12, B 1, Brinellvägen 23, KTH, Stockholm, 13:00 (svensk)
Opponent
Veileder
Merknad

QC 20120928

Tilgjengelig fra: 2012-09-28 Laget: 2012-09-27 Sist oppdatert: 2012-09-28bibliografisk kontrollert

Open Access i DiVA

fulltext(199 kB)406 nedlastinger
Filinformasjon
Fil FULLTEXT01.pdfFilstørrelse 199 kBChecksum SHA-512
b1130a0dffc281d5728c0c9db43a84ea2209f9f3b4bb1f129fe88d78e6eb2c41120973b0e9c0db49ccf4acc615946fda5ed66fa9fed736e771a7eed903b9f025
Type fulltextMimetype application/pdf

Andre lenker

Forlagets fulltekstScopusPublished version

Søk i DiVA

Av forfatter/redaktør
af Klintberg, TordBjörk, Folke
Av organisasjonen
I samme tidsskrift
Structural Survey

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 406 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

doi
urn-nbn

Altmetric

doi
urn-nbn
Totalt: 462 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf