Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Hur kylmaskiner kan utnyttjas för att även tillgodose ett värmebehov
KTH, School of Industrial Engineering and Management (ITM), Energy Technology.
2016 (Swedish)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesisAlternative title
How chillers can be utilized to satisfy a heating demand (English)
Abstract [sv]

I detta examensarbete har potentialen i att utnyttja värmen från kylmaskiner för att tillgodose ett värmebehov i en befintlig fastighet undersökts. Fastigheten som ägs och används av försvarskoncernen Saab AB har tre olika kylcentraler som betjänar olika delar av fastigheten. Arbetet inleddes med en kartläggning av kylproduktionen och värmebehovet för att avgöra magnituden av överlappet av dessa i de olika byggnadsdelarna. Därefter valdes en av kylcentralerna ut för djupare undersökningar av hur den skulle kunna bidra till att täcka ett värmebehov. Alla tre byggnadsdelarna har betydande överlapp mellan kyl- och värmebehov och därmed stor potential till energibesparing genom återvinning av värmen från kylmaskinerna.

Byggnaden som internt betecknas D-huset har mycket goda förutsättningar för värmeåtervinning från kylmaskinerna och sådan finns redan installerad.

A-huset och B-huset har båda stort överlapp mellan värme och kyla (ca 1900 respektive 1400 MWh/år) men utformningen av befintliga värmesystem orsakar en del svårigheter att i praktiken utnyttja värmen från kylmaskinerna.

A-huset valdes ut för djupare studier. Olika lösningar för att återvinna värmen från kylmaskinerna undersöktes. Den mest fördelaktiga lösningen innebär att nya värmeledningar dras för att värma returvattnet från ventilationsaggregatens förvärmningsbatterier. Åtgärden innefattar förändring av kylmaskinsdriften i form av ändrad kondenseringstemperatur samt smärre justering av temperaturnivåer i ventilationsaggregat. I övrigt består åtgärden främst av att sammankoppla värmeförbrukare med kylmaskiner snarare än några större förändringar av värmesystemet eller kylmaskinerna. En sådan lösning skulle kunna återvinna nästan 1400 MWh värme per år och ge nettodriftkostnadsbesparingar på drygt 800 000 kronor per år. Återbetalningstiden beräknas bli ca 2 ½ år men osäkerheten i investeringskostnader för att implementera föreslagen åtgärd och därmed även återbetalningstiden är mycket stor.

Abstract [en]

This thesis the potential of using the heat from the chillers to meet the heating needs of an existing property was investigated. The property is owned and used by defense group Saab AB and has three different refrigeration plants serving different buildings. The work began with a survey of the cooling and heat demand to determine the magnitude of the overlap of these in the various buildings. Then one of the refrigeration plants was selected for deeper studies of how it could contribute to cover the heating demand. All three buildings have significant overlap between the cooling and heating requirements and thus great potential for saving energy by recovering the heat from the chillers.

The building internally designated building D has very good potential for heat recovery from the cooling systems and such is already installed.

Building A and building B both have large overlap between heating and cooling (about 1,900 and 1,400 MWh / year), but the design of the existing heating system causes some difficulties, using the heat from the chillers in practice.

Building A was chosen for further studies. Various solutions to recover the heat from the cooling systems were investigated. The most advantageous solution involves installing new heating ducts to heat the return water from preheaters of ventilation units. The measure includes changes in chiller operation by way of changed condensing temperature and slight adjustment of temperature levels in the ventilation units. Otherwise the action primarily consists of interconnecting heat consumers with chillers rather than any major changes to the heating system or chillers. Such a solution could recover nearly 1,400 MWh of heat per year and provide a net operating cost savings of more than 800,000 SEK per year. The payback period is estimated to be about 2 ½ years but the uncertainty in the investment costs to implement the proposed measure and thus the repayment period is very large.

Place, publisher, year, edition, pages
2016. , 68 p.
National Category
Mechanical Engineering
Identifiers
URN: urn:nbn:se:kth:diva-193325OAI: oai:DiVA.org:kth-193325DiVA: diva2:1003087
Supervisors
Examiners
Available from: 2016-10-03 Created: 2016-09-30 Last updated: 2016-10-03Bibliographically approved

Open Access in DiVA

fulltext(1265 kB)46 downloads
File information
File name FULLTEXT01.pdfFile size 1265 kBChecksum SHA-512
390eb50f215bc9f1d91f4c43ec58d586c1965fc2ace731641ae7ce1a0d4cf5178d2349bd00138afb80fca82756385895cf68852b9c8fd8c57724b13bc1cbbc54
Type fulltextMimetype application/pdf

By organisation
Energy Technology
Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 46 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 1837 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf