Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Effektivt utnyttjande av elnät
KTH, School of Chemical Science and Engineering (CHE).
KTH, School of Chemical Science and Engineering (CHE).
2017 (Swedish)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesisAlternative title
Efficient usage of power grids (English)
Abstract [sv]

Tidigare har det inte existerat incitament för elnätsföretag att minska på nätförluster eller jämna ut belastningen på elnätet. Till följd av detta beslutade EU år 2012 om ett nytt energieffektiviseringsdirektiv vilket ledde till en lagändring den 1 juni 2014 i Sverige. Energimarknadsinspektionen (Ei) fick i samband med detta ett uppdrag att ta fram föreskrifter i syfte om att skapa incitament till att reducera nätförlusterna samt att jämna ut nätets belastning.

Inför varje så kallade tillsynsperiod, som sträcker sig i fyra år, utformar Ei intäktsramen för varje enskilt elnätsföretag. Detta innebär att varje enskilt elnätsföretags intäkter är begränsade till den intäktsram som Ei har satt under tillsynsperioden. Vid utformningen av intäktsramen är Ei:s uppgift att undersöka huruvida nätverksamheten bedrivits effektivt. Detta kan leda till att intäktsramen ökar eller minskar beroende på om elnätsföretaget har utnyttjat elnätet effektivt under tillsynsperioden (år 2016-2019) jämfört med referensperiod (år 2010-2103). Den parameter som Ei utgår ifrån för att få en indikation om hur effektivt elnätet har utnyttjats är genom att studera förändringen i nätförluster mellan tillsyns- och referensperioden.

Lokal produktion eller intermittent produktion, definieras som icke reglerbar produktion, exempelvis vindkraft och solkraft, dessa kan öka eller minska nätförluster. Ifall andelen nätförluster har tilltagit under tillsynsperioden i jämförelse med referensperioden, i samband med ökad andel lokal produktion, kan ett avdrag från elnätsföretagens intäktsram minskas. Detta bestäms utifrån vad som anses vara rimligt, med avseende på hur stor påverkan den intermittenta produktionen har haft på nätförlusterna. Denna del av incitamentet menar Ei är nödvändigt för att inte hämma utbyggnaden av intermittent produktion.

Inför denna studie saknas det dock underlag för att kunna härleda hur mycket av förändringen i nätförluster som kan kopplas direkt till intermittent produktion. Detta är ett av flera incitament för E.ON att ta fram ett diskussionsunderlag som bland annat kan redogöra den intermittenta produktionens inverkan på förändringar i nätförluster.

Denna studie ska bistå E.ON med en del av det diskussionsunderlag som ska användas i framtida diskussioner med Ei gällande intäktsramen. Studiens övergripande resultat är en generaliserbar modell som har genererats fram genom att analysera befintliga områden med vindkraftsproduktion. Modellen påvisar vindkraftsproduktionens inverkan på nätförluster och är applicerbar för samtliga områden med vindkraftsproduktion. Denna modell ska fungera som ett redskap för att härleda hur nätförlusterna har påverkats med vindkraftsproduktion över tillsynsperioden och referensperioden. På detta sätt kan E.ON i framtida diskussioner med Ei påvisa att en del av de nätförluster som uppkommer är en direkt effekt av intermittent produktion.

Denna studie har utförts på uppdrag av E.ON som har uttryckt ett önskemål att hela rapporten ska vara konfidentiellt. Av denna anledning har endast sammanfattning/abstract publicerats.

Abstract [en]

There have previously not existed incentives for grid companies to reduce grid losses or even out the load on the power grid. As a consequence to this, the EU decided in 2012 on a new energy efficiency directive which led to a change in the law June 1, 2014 in Sweden. The Swedish Energy Markets Inspectorate (Ei) received in correlation to this a mission to develop regulations in the purpose of creating incentives to reduce grid losses and even out the load on the power grid.

Before every so-called regulatory period, which extends for four years, Ei constructs a revenue cap for each grid company. This means that every single grid company’s revenue is limited to the revenue cap which Ei has determined for the regulatory period. In determining the revenue cap Ei task is to investigate whether the grid operations have been conducted efficiently. This could result in an increased or decreased revenue cap depending on whether the grid companies have been utilised the electricity grid effectively during the regulatory period (year 2016-2019) in comparison to the reference period (year 2010-2103). The parameter that Ei assumes in order to receive an indication of how efficiently the electricity grid has been used is by studying the change in grid losses between the regulatory and reference period.

Local production or intermittent production, is defined as nonadjustable production such as wind and solar power, these can increase or decrease grid losses. If the share of grid losses has increased during the regulatory period in comparison to the reference period, in correlation with an increased share of local production, a deduction could be reduced from the grid company’s revenue cap. This is determined on a basis of what is considered reasonable, in terms of how large impact the intermittent production has had on grid losses. This part of the incentives Ei considers to be necessary in order not to inhibit the expansion of intermittent production.

Before this study, there was a lack of a basis to deduce how much of the change in grid losses that can directly be linked to intermittent production. This is one of several incentives for E.ON to develop a discussion basis that among others outlines the intermittent productions effect on changes in grid losses.

This study will provide E.ON with a part of the discussion basis that is going to be used in future discussions with Ei regarding the revenue cap. The study's overall result is a generalized model that has been generated through analyzing existing areas with wind power production. The model proves the wind power productions effect on grid losses and is applicable to all areas with wind power production. This model should serve as a tool to derive how the grid losses has been affected by wind power production over the regulatory and reference period. In this way, E.ON can in future discussions with Ei prove that a part of the grid losses that arise are a direct effect of intermittent production.

This study has been commissioned by E.ON who has expressed the wish that the entire report should be confidential. For this reason, only the sammanfattning/abstract has been published.

Place, publisher, year, edition, pages
2017.
Keywords [en]
Grid losses, power grid, wind power, intermittent production, load
Keywords [sv]
Nätförluster, elnät, vindkraft, intermittent production, belastning
National Category
Chemical Engineering
Identifiers
URN: urn:nbn:se:kth:diva-207366OAI: oai:DiVA.org:kth-207366DiVA, id: diva2:1096858
Available from: 2017-05-19 Created: 2017-05-19 Last updated: 2017-05-19Bibliographically approved

Open Access in DiVA

No full text in DiVA

By organisation
School of Chemical Science and Engineering (CHE)
Chemical Engineering

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 96 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf