Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Minskning av byggfel genom väl utförda arbetsberedningar: Optimering av arbetsberedningar i syfte att motverka byggfel
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Building Technology and Design.
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Building Technology and Design.
2018 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
Avoiding additional work by implementing work preparations : Optimizing workpreparations to avoid additional suboperations (English)
Abstract [sv]

Sammanfattning

 

Oönskade tilläggs- och ändringsarbeten uppkommer i byggproduktionen som medför ekonomiska påföljder och förseningar i tidplanen. Dessa arbeten går under det gemensamma namnet ÄTA-arbeten (Ändrings-, tilläggs- och avgående arbeten) och orsakas av diverse anledningar. En av orsakerna till uppkomsten av de oönskade ÄTA-arbetena är svårigheterna med att framställa utförliga arbetsberedningar.

 

Rapporten syftar till att redogöra hur effektivare arbetsberedningar kan förhindra uppkomsten av oönskade ÄTA-arbeten samt hur arbetsberedningarna kan förbättras. Under arbetets gång har svar till formulerade frågeställningar frambringats genom enkätundersökningar och intervjuer och diskussioner kring ämnet har förts utifrån det egna medverkandet i ett antal arbetsberedningar. Rapporten avgränsas till platsbesök på två projekt; Projekt Driftområde Arlanda samt och Kontorsfastighet Hus 4 Nya Danderyds Centrum.

 

Analyserna och slutsatserna presenteras i rapportens avslutande delar och ger en uppfattning på hur arbetsberedningar står i relation till uppkomsten av oönskade ÄTA-arbeten. Med väl utförda arbetsberedningar avser man att skapa bästa möjliga förutsättningar för ett arbetsmoment och på så sätt minimerar risken för uppkomsten av oönskade ÄTA-arbeten. Styrning, planering, hantering av tidsbrist, resurstillgänglighet och engagemang är faktorer som i stor utsträckning styr huruvida bra eller dåligt en arbetsberedning blir. Dessa ämnen kommer att behandlas mer ingående i rapporten.

 

Rekommendationer kring hur arbetsberedningar kan förbättras och effektiviseras utifrån olika aspekter gällande arbetsplatsens utformning, engagemanget hos arbetarna, erfarenhetsåterföring samt dokumentationen av arbetsberedningarna redovisas i rapporten.

 

Abstract [sv]

Abstract

 

Unwanted additions and changes occur during the production-phase of a construction project which account to financial penalties and delays in the timetable. These changes and additions fall under the common name variations, implying to works in the form of additions, substitutions and omissions from the original scope of works. These works are caused by various reasons, one being the difficulty in producing thorough and accurate work preparations.

 

The report aims at describing how more efficient work preparations can prevent the occurrence of unwanted variations as well as finding different ways to further improve the work preparations. Through surveys and interviews answers to the formulated questions have been produced. Discussions in relation to the current subject have been made through participation in numerous work preparations. The report is limited to site visits on two projects; Projekt Driftområde Arlanda and Kontorsfastighet Hus 4 Nya Danderyds Centrum.

 

The analysis and conclusions are presented in the final sections of the report and provide clear answers to how work preparations relate to the occurrence of unwanted variations. With thorough work preparations, one intends to create the best possible conditions for an activity, thus minimizing the risk of the occurrence of unwanted variations. Proper Management, planning, handling of time shortages, resource availability and commitment amongst employees are factors that largely determine whether a thorough or inadequate job will be done. These topics will be discussed in further detail as the report proceeds.

 

Recommendations on how to improve and optimize work preparations based on various aspects of the workplace environment, employee involvement, experience correspondence and the documentation of work preparation are presented in the report.

Place, publisher, year, edition, pages
2018. , p. 49
Series
Examensarbete Byggnadsteknik
National Category
Construction Management
Identifiers
URN: urn:nbn:se:kth:diva-226515OAI: oai:DiVA.org:kth-226515DiVA, id: diva2:1203570
External cooperation
JM Entrepenad AB
Subject / course
Building Technology
Educational program
Bachelor of Science in Engineering - Constructional Engineering and Design
Supervisors
Examiners
Available from: 2018-06-04 Created: 2018-05-03 Last updated: 2018-06-04Bibliographically approved

Open Access in DiVA

No full text in DiVA

By organisation
Building Technology and Design
Construction Management

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 64 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf