kth.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Effektivitets- och tidsanalyser av Scanias chassimontering
KTH, School of Industrial Engineering and Management (ITM), Production engineering.
KTH, School of Industrial Engineering and Management (ITM), Production engineering.
2023 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
Efficiency and Time Analyzes of Scania's Chassis Assembly (English)
Abstract [sv]

På Scanias chassimontering används mjukvaran AVIX för att skapa elementblad, positionsstandarder och balansera monteringslinorna. Tidssättningen sker för närvarande med stoppurmetoden, men en övergång till Scania Time Block (STB) är pågående. STB är en metod som redan har standardiserade tider för olika moment och används i stället för manuell tidtagning. Målet är att förstå hur Scania arbetar med AVIX och ES, analysera kompetenserna i AVIX och STB, samt tidssätta fler positioner med STB och förbättra processer och rutiner.

STB bygger på MTM-SAM metoden och använder standardiserade koder för olika moment på ES. En utredning genomfördes på trycktanksförmonteringen för att undersöka tidsdifferensen mellan de olika metoderna och tidspress hos montörerna. Genom att använda STB kunde man få en objektiv och standardiserad tidsuppskattning för att producera en specifik variant.

En intressant observation var att det fanns en tydlig avvikelse mellan de manuellt klockade tiderna och STB-tiderna. De manuella tiderna verkar inte ta hänsyn till specifika steg som operatörerna måste utföra. Baserat på analysen rekommenderas Scania att införa STB på alla produktionsanläggningar, särskilt för chassi, för att säkerställa att montörerna får en rättvis takttid som tar hänsyn till den faktiska tiden för varje moment. Detta skulle bidra till förbättrade processer och rutiner i produktionen.

Abstract [en]

Scania's chassis assembly utilizes the software AVIX to create bill of materials, position standards, and balance assembly lines. Currently, time measurement is done manually using stopwatch, but a transition to Scania Time Block (STB) is underway. STB is a method that already has standardized times for different tasks and replaces manual timing. The goal is to understand Scania's utilization of AVIX and ES, analyze the competencies in AVIX and STB, time more positions using STB, and improve processes and routines.

STB is based on the MTM-SAM method and employs standardized codes for various tasks on the assembly line. An investigation was conducted on the pre-assembly of pressurized tanks to examine the time differences between the methods and the time pressure experienced by the assemblers. By utilizing STB, an objective and standardized time estimation for producing a specific variant could be obtained.

An interesting observation was a clear deviation between the manually timed durations and the STB times. The manual timings seemed to overlook specific steps that operators must perform. Based on the analysis, it is recommended that Scania implement STB across all production facilities, particularly for chassis, to ensure fair cycle times that consider the actual time required for each task. This would contribute to improved processes and routines in the production line.

Place, publisher, year, edition, pages
2023. , p. 50
Series
TRITA-ITM-EX ; 2023:304
Keywords [en]
Production, Assembly, tact time, Time efficiency, time analysis, Stopwatch Method, MTM-1, SAM
Keywords [sv]
Produktion, Montering, takt tid, Tidseffektivisering, tidsanalys, Stoppur Metoden, MTM-1, SAM
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:kth:diva-329261OAI: oai:DiVA.org:kth-329261DiVA, id: diva2:1770050
External cooperation
Scania CV AB
Supervisors
Examiners
Available from: 2023-06-19 Created: 2023-06-19

Open Access in DiVA

fulltext(1326 kB)189 downloads
File information
File name FULLTEXT01.pdfFile size 1326 kBChecksum SHA-512
ee6f78f4e49c204960d19de9ba0a14b986615ef58f93e7e4e89368a0605980da6a1dad0beced4deb89624ce877d38422e7fd8466aa290f858c4537b8c6944574
Type fulltextMimetype application/pdf

By organisation
Production engineering
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 189 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 358 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf