Stability assessment of railway trackwork scheduling in Sweden
Department of Technology and Society, Lund University, P. O. Box 118, 22100, Lund, Sweden, P. O. Box 118; K2 Swedish Knowledge Centre for Public Transport, Bruksgatan 8, 222 36, Lund, Sweden, Bruksgatan 8.
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Transport planning.ORCID iD: 0000-0002-2141-0389
2024 (English)In: European Transport Research Review, ISSN 1867-0717, E-ISSN 1866-8887, Vol. 16, no 1, article id 27Article in journal (Refereed) Published
Abstract [en]

Ensuring the reliability of railway transportation is heavily dependent on the quality of its infrastructure. In this regard, renewal and maintenance of the railway track infrastructure, referred to as trackwork, play a vital role. However, trackwork execution requires temporary capacity restrictions for train traffic. Therefore, harmonising the train and maintenance schedules is critical but challenging to accomplish when one is frequently changing. This paper explores and models the nature of trackwork schedule instability at the tactical level of the scheduling process. We analyse data from one year of trackwork rolling horizon plans, focusing on weekly changes at eight key trackwork locations across Sweden’s railway network. Our study considers various factors that may affect schedule stability, such as track type, location, time of day, train traffic intensity, and the type of prevailing traffic. We find that schedule instability increases as the rolling horizon plan approaches its end. The regression analysis reveals that the most significant predictors of changes in trackwork schedules include previous changes, track type (single vs. double), work location (at station vs. between stations), and the timing of trackwork (daytime vs. nighttime and month). These provide insights to trackwork planners in making informed and proactive decisions about trackwork timeslot allocation.

Place, publisher, year, edition, pages
Springer Nature , 2024. Vol. 16, no 1, article id 27
Keywords [en]
Modelling analysis, Plan instability, Railway, Schedule nervousness, Trackwork
National Category
Transport Systems and Logistics
Identifiers
URN: urn:nbn:se:kth:diva-347052DOI: 10.1186/s12544-024-00643-3ISI: 001227544500001Scopus ID: 2-s2.0-85193687458OAI: oai:DiVA.org:kth-347052DiVA, id: diva2:1862780
Note

QC 20240531

Available from: 2024-05-30 Created: 2024-05-30 Last updated: 2024-06-04Bibliographically approved

Open Access in DiVA

No full text in DiVA

Other links

Publisher's full textScopus

Authority records

Ma, Zhenliang

Search in DiVA

By author/editor
Ma, Zhenliang
By organisation
Transport planning
In the same journal
European Transport Research Review
Transport Systems and Logistics

Search outside of DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 43 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf