Change search
ReferencesLink to record
Permanent link

Direct link
A cost model for the effect of setup time reduction in stainless steel strip production
KTH, School of Industrial Engineering and Management (ITM), Production Engineering.
2007 (English)In: 1st Swedish Production Symposium, 2007, 1-8 p.Conference paper (Refereed)
Abstract [en]

Setup time reductions facilitate the flexibility needed for just-in-time production. An integrated steel mill with meltshop, continuous caster and hot rolling mill is often operated as decoupled processes. Setup time reduction provides the flexibility needed to reduce buffering, shorten lead times and create an integrated process flow. The interdependency of setup times, process flexibility and integration were analysed through system dynamics simulation. The results showed significant reductions of energy consumption and tied capital. It was concluded that setup time reduction in the hot strip mill can aid process integration and hence improve production economy while reducing environmental impact

Place, publisher, year, edition, pages
2007. 1-8 p.
Keyword [en]
Steel production, hot rolling, continuous casting, manufacturing flexibility, production economy, setup time reduction, lean production, system dynamics
National Category
Production Engineering, Human Work Science and Ergonomics Business Administration
URN: urn:nbn:se:kth:diva-11700OAI: diva2:279609
QC 20100810Available from: 2009-12-04 Created: 2009-12-04 Last updated: 2010-08-10Bibliographically approved
In thesis
1. Strategic and operational capabilities in steel production: Product variety and performance
Open this publication in new window or tab >>Strategic and operational capabilities in steel production: Product variety and performance
2009 (English)Doctoral thesis, comprehensive summary (Other academic)
Abstract [en]

Steel producers that employ niche market strategies are continuously seeking to reduce production cost while maintaining adiverse product mix. The business model is typically based onmarketing of high–strength special or stainless steels. However,the desire to avoid direct cost competition is over time gradually leading towards increased product variety and smaller ordervolumes (tonnes per order) for each product.

This thesis analyses how production cost is linked to productvariety in steel strip production. Results are based on new modelsfor assessment of opportunities for performance improvement inhigh product–variety steel production.

The need for flexible production processes increases with increasing product variety. Operational capabilities linked to processflexibility determine the extent to which steel producers caneliminate in–process inventory and accomplish close coupling between process steps. Niche market producers that invest inprocess flexibility improvements can lower production costs bothdue to reduced work–in–process and lower energy consumption.An additional benefit is reduced environmental impact.

The following problems are addressed:

• Development of a method to assess the influence of productvariety on performance in steel production.

• Development of models of continuous casting and hotrolling that account for product variety and cost effectswith consideration of varying degrees of process flexibility.

• Development of a strategy process model that focus on thestrategic value of operational capabilities related to processflexibility.

Investments in operational capabilities regarding process flexibility have a strategic impact. An appreciation for the effectsof process flexibility should permeate the organisation’s daily work since the accumulated contribution of many, seemingly unimportant, incremental changes significantly influences thestrategic opportunities of the company.

Abstract [en]

Stålproducenter med nischmarknadsstrategier försöker ständigt sänka sina produktionskostnader samtidigt som en varierad produktflora bibehålls. Affärsmodellen bygger i typfallet på försäljning av höghållfasta specialstål eller rostfria stål. Strävan att undvika direkt priskonkurrens leder dock med tiden gradvis till ökad produktvariation och mindre ordervolymer (ton per order)för varje produkt.

Denna avhandling analyserar hur produktionskostnaden är kopplad till graden av produktvariation vid tillverkning av band.Resultaten bygger på nya modeller för utvärdering av förutsättningarnaför prestandaförbättring i stålindustri med stor produktvariation.

Behovet av flexibla produktionsprocesser ökar med ökande produktvariation. Praktiska förmågor kopplade till processflexibilitet avgör till vilken grad ståltillverkare förmår att eliminera mellanlager och åstadkomma en tät koppling mellan processteg.Nischmarknadsproducenter som investerar i förbättrad flexibilitet kan sänka sina produktionskostnader både genom minskad mängd produkter i arbete och reducerad energiförbrukning. Detta medför också minskad miljöbelastning.Följande problemställningar adresseras:

• Utveckling av en metod för att utvärdera inverkan av produktvariationpå prestanda vid ståltillverkning.

• Utveckling av en modell för stränggjutning och varmvalsningsom tar hänsyn till produktvariation och kostnadseffekterför olika grad av processflexibilitet.

• Utveckling av en strategimodell som fokuserar på det strategiskavärdet av operativa förmågor kopplade till processflexibilitet.

Investeringar i operativa förmågor vad avser processflexibilitet är av strategisk betydelse. Förståelse för betydelsen av processflexibilitetbör genomsyra det dagliga arbetet eftersom det samladebidraget av många, till synes obetydliga, små förändringar haren avgörande inverkan på företagets strategiska förutsättningar

Place, publisher, year, edition, pages
Stockholm: KTH, 2009. xiv, 126 p.
Trita-IIP, ISSN 1650-1888 ; 09-08
Steel production, system dynamics, product variety, production strategy, cost models
National Category
Production Engineering, Human Work Science and Ergonomics
urn:nbn:se:kth:diva-11642 (URN)978-91-7415-507-5 (ISBN)
Public defence
2009-12-18, M311, Brinellvägen 68, KTH, Stockholm, 13:00 (Swedish)
QC 20100810Available from: 2009-12-04 Created: 2009-11-27 Last updated: 2010-08-10Bibliographically approved

Open Access in DiVA

No full text

Other links

Search in DiVA

By author/editor
Storck, JoakimLindberg, Bengt
By organisation
Production Engineering
Production Engineering, Human Work Science and ErgonomicsBusiness Administration

Search outside of DiVA

GoogleGoogle Scholar
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 68 hits
ReferencesLink to record
Permanent link

Direct link