Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
QFD in the Development of Engineering Studies
KTH, Superseded Departments, Production Engineering.
KTH, Superseded Departments, Machine Design.
1995 (English)In: Proceedings of the seventh symposium on Quality Function Deployment, 1995Conference paper, Published paper (Refereed)
Abstract [en]

Shorter development time, the need to satisfy customer needs and demands, and increasing competition. These are common requirements of today's products and product development processes. The same kind of requirements might also be put on the engineering students passing through an educational system. This analogy has been used in the planning of engineering studies at this Swedish university programs. This paper reports the use of QFD in developing an education a system that provides high quality engineers well adapted to a productive life and capable of life-long learning.

Place, publisher, year, edition, pages
1995.
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:kth:diva-13658OAI: oai:DiVA.org:kth-13658DiVA: diva2:326347
Note
QC 20100622Available from: 2010-06-22 Created: 2010-06-22 Last updated: 2011-02-04Bibliographically approved
In thesis
1. Conceptual ProductDevelopment in SmallCorporations
Open this publication in new window or tab >>Conceptual ProductDevelopment in SmallCorporations
2010 (English)Licentiate thesis, comprehensive summary (Other academic)
Abstract [en]

The main objective of the thesis “Conceptual Product Development inSmall Corporations” is by the use of a case study test the MFD™-method(Erixon G. , 1998) combined with PMM in a product development project.(Henceforth called MFD™/PMM-method). The MFD™/PMM-methodused for documenting and controlling a product development project hassince it was introduced been used in several industries and projects. Themethod has been proved to be a good way of working with the early stagesof product development, however, there are almost only projects carriedout on large industries which means that there are very few references tohow the MFD™/PMM-method works in a small corporation. Therefore,was the case study in the thesis “Conceptual Product Development inSmall Corporations” carried out in a small corporation to find out whetherthe MFD™/PMM-method also can be applied and used in such acorporation.

The PMM was proposed in a paper presented at Delft University ofTechnology in Holland 1998 by the author and Gunnar Erixon. (Seeappended paper C: The chart of modular function deployment.) The title “Thechart of modular function deployment” was later renamed as PMM,Product Management Map. (Sweden PreCAD AB, 2000). The PMMconsists of a QFD-matrix linked to MIM (Module Indication Matrix) via acoupling matrix which makes it possible to make an unbroken chain fromthe customer domain to the designed product/modules. (See Figure 3-2).The PMM makes it easy to correct omissions made in creating newproducts and modules.

In the thesis “Conceptual Product Development in Small Corporations”the universal MFD™/PMM-method has been adapted by the author tothree models of product development; original-, evolutionary- andincremental development.

The evolutionary adapted MFD™/PMM-method was tested as a casestudy at Atlings AB in the community Ockelbo. Atlings AB is a smallcorporation with a total number of 50 employees and an annual turnoverof 9 million €. The product studied at the corporation was a steady rest for supporting long shafts in turning. The project team consisted ofmanagement director, a sales promoter, a production engineer, a designengineer and a workshop technician, the author as team leader and acolleague from Dalarna University as discussion partner. The project teamhas had six meetings.

The project team managed to use MFD™ and to make a complete PMMof the studied product. There were no real problems occurring in theproject work, on the contrary the team members worked very well in thegroup, having ideas how to improve the product. Instead, the challenge fora small company is how to work with the MFD™/PMM-method in thelong run! If the MFD™/PMM-method is to be a useful tool for thecompany it needs to be used continuously and that requires financial andpersonnel resources. One way for the company to overcome the probablelack of recourses regarding capital and personnel is to establish a goodcooperation with a regional university or a development centre.

Place, publisher, year, edition, pages
KTH: Stockholm, 2010. 96 p.
Series
TRITA-IIP, ISSN 1650-1888 ; 10-03
National Category
Engineering and Technology
Identifiers
urn:nbn:se:kth:diva-13662 (URN)978-9174156577 (ISBN)
Supervisors
Note

QC 20100622

Available from: 2010-06-22 Created: 2010-06-22 Last updated: 2016-12-16Bibliographically approved

Open Access in DiVA

No full text

Search in DiVA

By author/editor
Nilsson, PerLöfgren, Bengt
By organisation
Production EngineeringMachine Design
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 122 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf