Fältstudier av produktionstidplan på Kv. Solägget
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Building Technology and Design.
2010 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
Field studies of the production schedule at the block Solägget (English)
Abstract [sv]

Under drygt två månader har produktionen vid JM Entreprenads projekt Kv. Solägget följts för att med utgångspunkt i projektets produktionstidplan, aktuell verklig position, diverse dokument samt i intervjuer avgöra varför fortskridandet eventuellt avviker från det planerade, där främst förseningar var intressanta.

Kv. Solägget genomförs på generalentreprenad åt JM AB och följer således de arbetsmetoder som används inom JM AB. En väsentlig skillnad mellan JM AB och JM Entreprenad är att JM Entreprenad inte är lika väl inkörda på gällande enhetstider och rutiner som JM AB:s hantverkare är. Genom att i tidigt skede sätta in ytterligare resurser än vad som var planerat i kalkylen undvek man att under tiden för min fältstudie uppnå en avvikelse som motsvarar en försening och snarare lyckades arbeta in ett försprång på upp till två veckor.

För att möjliggöra en produktion utan förseningar behandlar rapporten hårda, mjuka och yttre faktorer med en betydelsefull utgångspunkt i vikten av att åstadkomma en väl utarbetad planering inför produktionsstart och på så sätt i ett tidigt skede ta ställning till möjliga faktorer som kan komma att påverka avstämningarna mot produktionstidplanen på ett negativt sätt.

Abstract [en]

During around two months the production of the project of JM Entreprenad named the block Solägget has been followed contraining to the basis of the production schedule, the current actual position, documents of the project and also interviews to determine why the progression may be different from the planned, why the mainly interesting were to analyze the delays.

The block Solägget is implemented on a general contractor for JM AB and therefore the project follows the practices of JM AB. One significant difference between JM AB and JM Entreprenad is that JM Entreprenad isn´t as used to the current unit times and routines as JM AB are. By the early deployment of additional resources than what were planned in advance the delays were avoided during the period of my field study and instead JM Entreprenad managed to work up a lead of up to two weeks.

To enable a production without any delays this report treats hard, soft and external factors with an important basis of the importance of achieving a well-established planning before starting any production and in that way consider possible factors that may affect the reconciliation of the production schedule in a negative way.

Place, publisher, year, edition, pages
2010.
Keyword [en]
External factors, hard factors, reconciliations, production schedule, soft factors, unit times
Keyword [sv]
Avstämningar, enhetstider, hårda faktorer, mjuka faktorer, produktionstidplan, yttre faktorer
Identifiers
URN: urn:nbn:se:kth:diva-36591OAI: oai:DiVA.org:kth-36591DiVA: diva2:430924
Educational program
Bachelor of Science in Engineering - Constructional Engineering and Design
Uppsok
Technology
Supervisors
Note
2010:12Available from: 2011-07-14 Created: 2011-07-13 Last updated: 2011-07-14Bibliographically approved

Open Access in DiVA

Lindgren_examensarbete(1500 kB)1044 downloads
File information
File name FULLTEXT01.pdfFile size 1500 kBChecksum SHA-512
7e93c93b7280c0d1b30ae0290ef43f572cd1d418f1061cb8e542264856fe7b09a3daf177cb23303bc418d35934ad9e6b4f298695fbe8457157be4cad0a920bb3
Type fulltextMimetype application/pdf

By organisation
Building Technology and Design

Search outside of DiVA

GoogleGoogle Scholar
Total: 1044 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 421 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf