Preliminary design and multi-criteria analysis of solutions for widening an existing concrete bridge: Case of the Bridge of Chaillot in Vierzon (France)
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Structural Design and Bridges.
2011 (English)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesis
Abstract [en]


Europe experienced the destruction of numerous infrastructures during World War II, followed by a reflation and a strong economic growth during the next two decades allowing a more perennial and durable situation. A classical bridge lasting in general around 80 years, one should observe that these constructions built after the war will have to be either replaced either seriously strengthened in a few years. Besides, since the needs also vary over time, transportation infrastructures built during those years might not be adapted to the actual needs anymore – some bridges might thus have to be widened.

A case study has been chosen in order to simulate under which conditions the widening of such a bridge can be performed. This road bridge, located in Vierzon in France, is rather simple since it is made of simply supported prestressed concrete beams and of reinforced concrete piers. It has been chosen in particular for its reduced size – three spans of 30 m each and two road lanes – that corresponded well to this project. Based on some data provided when the bridge was initially built and on a visual inspection, this project suggests six technical solutions to double the actual amount of lanes. An evaluation of the performance of the solutions according to three criteria – durations of works, cost of the works, and environmental impact – is made in order to give recommendations regarding the optimal solution.

The results show that in spite of being installed quickly, adding steel beams is more expensive and has a greater impact on the environment than adding prestressed concrete beams. Regarding the modification of piers, the solution suggesting widening the existing piers is preferable than adding new extra piers according to all the criteria. Consequently, among all the solutions analysed, the optimal one is also the simplest one. Finally, the limits of the study and some suggestions for improvements are indicated.

Place, publisher, year, edition, pages
2011. , 111 p.
Trita-BKN-Examensarbete, ISSN 1103-4297 ; 324
Keyword [en]
prestressed concrete bridge, modernization, rehabilitation, widening, multi-criteria analysis, Life Cycle Assessment, LCA, Life Cycle Cost, LCC
National Category
Civil Engineering
URN: urn:nbn:se:kth:diva-40479OAI: diva2:441438
Subject / course
Structural Design and Bridges
Educational program
Degree of Master - Infrastructure Engineering
Available from: 2011-09-16 Created: 2011-09-16 Last updated: 2011-09-16Bibliographically approved

Open Access in DiVA

fulltext(9395 kB)3904 downloads
File information
File name FULLTEXT01.pdfFile size 9395 kBChecksum SHA-512
Type fulltextMimetype application/pdf

By organisation
Structural Design and Bridges
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 3904 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 229 hits
ReferencesLink to record
Permanent link

Direct link