Cost overruns in transport projects - Experiences from Sweden
KTH, School of Architecture and the Built Environment (ABE), Transport Science.
2011 (English)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesis
Abstract [en]

Cost overrun of transport projects is one of the most important problems in transport planning. Apart from causing budget overruns, it also results in uncertain cost-benefit for decision making. This thesis studies cost overruns in Sweden and internationally, factors affecting cost overruns and possible improvements of cost calculations.

The literature study confirms that cost overrun problem is a global phenomenon. The average cost overruns in rail projects are always higher than in road projects. We have compared cost estimations and outcomes of 167 road and rail projects in Sweden during the period 1997-2009. This reveals that average cost overruns are 11% (SD = 24.6%) and 21% (SD = 50.5%) for road and rail projects, respectively. In Sweden, the average cost overrun in road projects is similar to other countries, while the average cost overrun in rail projects is lower than in other countries. However, the standard deviation of cost overruns in Swedish rail projects is very high. The cost overruns in road and rail projects in Sweden have been constant for the 13-year period and cost estimates have not improved over time. Furthermore, small Swedish transport projects (< 100 million SEK) have much higher percentage of cost overruns than large projects. To improve cost estimates in Sweden, the Successive Calculation method has recently been applied. We have collected data for 295 planned projects and find that the variance is significantly lower in these than in actual outcomes, and that the difference is surprisingly small between projects in different planning stages. Another method, Reference Class Forecasting, is demonstrated in two case studies - Stockholm bypass and Västlänken. The two methods are also compared in the thesis. For both case studies, the project costs by using the Reference Class Forecasting method are higher than the project costs by using the Successive Calculation based on the equal costs at 50% confident level of cost overrun.

Place, publisher, year, edition, pages
2011.
Series
TSC-MT, 11-018
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:kth:diva-42444OAI: oai:DiVA.org:kth-42444DiVA: diva2:447030
Uppsok
Technology
Available from: 2011-10-10 Created: 2011-10-10

Open Access in DiVA

fulltext(4377 kB)4163 downloads
File information
File name FULLTEXT01.pdfFile size 4377 kBChecksum SHA-512
be3160d7a9a7bf7a174110d78b79244784e227fecbdcb66952a083e8e1a6b35b9701e508f1199af17464bff542bfd38c6bccc4218b469173b60e1509cc9b9bf7
Type fulltextMimetype application/pdf

By organisation
Transport Science
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 4163 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 375 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf