Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Integer modeling of spinning reserve requirements in short term scheduling of hydro systems
KTH, Superseded Departments, Electric Power Systems.
KTH, Superseded Departments, Electric Power Systems.ORCID iD: 0000-0002-8189-2420
1997 (English)In: IEEE Power Engineering Review, ISSN 0272-1724, E-ISSN 1558-1705, Vol. 17, no 9, 36- p.Article in journal (Refereed) Published
Abstract [en]

In short term power system scheduling, reserve margins are kept in order to maintain the security of the system if a nonforecasted event occurs. The security is maintained by redispatch of the generators in the system. During the first seconds of the disturbance it is only possible to redispatch the online units. The maximal increase of the generation during these first seconds of the disturbance is called the spinning reserve. In hydro dominated power systems the spinning reserve is kept in the hydro system, since hydro units are easy to redispatch. For an online hydro unit the spinning reserve is the marginal between maximum generation and the actual generation. If a hydro plant has several units, only the online units will contribute to the spinning reserve. This means that we need to introduce integer variables to model the spinning reserve contribution from a hydro plant with several units. In the literature there are several examples of integer models for representation of the generation of hydro plants. The contribution of this paper is that it incorporates the integer representation of the spinning reserve into an integer model of generation scheduling. To this model we apply variable splitting and Lagrange relaxation to decompose the problem into one subproblem for the hydrological constraints and one subproblem for each hydro plant. In order to find feasible solutions we use a combination of network programming and heuristic search. The dual problem constructed by the decomposition is solved by a subgradient method. In the paper we apply the proposed method to a numerical example.

Place, publisher, year, edition, pages
1997. Vol. 17, no 9, 36- p.
Keyword [en]
Hydro scheduling, Lagrange relaxation, Spinning reserve
National Category
Other Electrical Engineering, Electronic Engineering, Information Engineering
Identifiers
URN: urn:nbn:se:kth:diva-52356OAI: oai:DiVA.org:kth-52356DiVA: diva2:466315
Note
QC 20111222Available from: 2011-12-15 Created: 2011-12-15 Last updated: 2017-12-08Bibliographically approved

Open Access in DiVA

No full text

Authority records BETA

Söder, Lennart

Search in DiVA

By author/editor
Nilsson, OskarSöder, Lennart
By organisation
Electric Power Systems
In the same journal
IEEE Power Engineering Review
Other Electrical Engineering, Electronic Engineering, Information Engineering

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 80 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf