Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Evaluation of route alternatives for a new railway by-pass through the west of Stockholm from an accessibility perspective.
KTH, School of Architecture and the Built Environment (ABE), Transport Science, Traffic and Logistics.
2011 (English)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesis
Place, publisher, year, edition, pages
2011. , 159 p.
Series
TSC-MT, 11-013
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:kth:diva-59687OAI: oai:DiVA.org:kth-59687DiVA: diva2:476068
Uppsok
Technology
Available from: 2012-01-11 Created: 2012-01-11

Open Access in DiVA

fulltext(7599 kB)229 downloads
File information
File name FULLTEXT01.pdfFile size 7599 kBChecksum SHA-512
1bd72fabae0e4e1b21b3ee542b838537de37d88d81ad8fec666fc2780f4166319d684dc63ce9aa94a5de72289aaa3591ddd8a8cfebfc49e755fd49da2edeb314
Type fulltextMimetype application/pdf

By organisation
Traffic and Logistics
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 229 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 68 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf