Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Granskning vid anläggningsändringar och dess påverkan på dammsäkerhet: - samt en beskrivning av säkerhetskultur hos Vattenfall Vattenkraft
KTH, School of Architecture and the Built Environment (ABE), Philosophy and History of Technology, Philosophy.
2009 (Swedish)Independent thesis Advanced level (degree of Master (One Year)), 20 credits / 30 HE creditsStudent thesis
Abstract [sv]

I Sverige finns det cirka 250 dammar som klassificeras som högkonsekvensdammar. Detta innebär att ett dammbrott i dessa dammar kan leda till mycket allvarliga konsekvenser. Vattenfall är ägare till ungefär hälften av dessa dammar. Som ägare är företaget fullt ansvariga för alla konsekvenser som följer av ett dammbrott.

Det stora flertalet av alla vattenkraftstationer i beståndet byggdes under 50, 60 och 70‐talet. Under senare år har en stor översyn av anläggningsbeståndet skett, vilket har lett till att stora projekt har påbörjats, och kommer att starta. Syftet är att modernisera och att öka effekten i de befintliga stationerna. Samtidigt har ett helt nytt säkerhetstänkande vuxit fram i branschen.

Ett stort steg togs då RIDAS, Kraftverkens riktlinjer för dammsäkerhet, togs fram. Detta var den första branschgemensamma standarden och kom 1997. Tidigare fanns det olika interna riktlinjer inom varje bolag. RIDAS har utformats som rekommendation hur nya dammar ska byggas idag, men avser även att användas för säkerhetsutvärdering av befintliga dammar. Det senare behöver utvecklas då de allra flesta dammarna i Sverige byggdes för ungefär femtio år sedan.

Inom Vattenfall arbetar man kontinuerligt på att öka kunskapen om dammar och dammsäkerhet. Detta sker dels rent tekniskt med mätningar, nya modeller, ombyggnationer mm, dels organisatoriskt. Detta examensarbete behandlar det senare.

Grunduppgiften i arbetet var från början att titta på hur dammsäkerheten påverkas av anläggningsförändringar, samt hur man ska granska dessa förändringar på bästa sätt. Då man genomför någon form av anläggningsändring finns det alltid en påverkan på själva dammens integritet, antingen direkt eller indirekt. För att fånga upp dessa är det viktigt att alla steg i processen granskas, med dammsäkerheten i fokus.

Under arbetets gång har en utvidgning, och omsvängning, skett till att mer belysa den allmänna säkerhetskulturen hos Vattenfall Vattenkraft.

Slutsatser:

  • Det finns ett stort behov av att vidareutveckla kvalitet och ledningssystem, samt att formalisera arbetsprocessen, inom Vattenfall Vattenkraft. Detta berör hela organisationen, vilket här innefattar samtliga berörda aktörer.
  • Arbetet med dammsäkerhet behöver breddas och det bör genomsyra hela verksamheten inom Vattenfall Vattenkraft.
  • Säkerhetsarbetet, och den kultur som omgärdar detta, behöver moderniseras. Med detta menas exempelvis förhållningssätt, uppföljning, incidentrapportering, verklighetsanpassning och utbildning.
  • Det finns två specifika omständigheter som behöver hanteras utifrån ett säkerhetsperspektiv. Dels att vattenkraften är en gammal bransch, och att det mesta av all vattenkraft byggdes för många år sedan. Dels att det finns en skarp uppdelning organisationen mellan ägare, underhåll och projekt.
Abstract [en]

There are approximately 250 dams in Sweden classified as 1A or 1B; the classification indicating the highest level of severity in case of a dam failure. Vattenfall owns about 50% of these dams, and is legally responsible for all consequences related to these dams.

The majority of all existing water power stations were built in the 50, 60 or 70´s. Through the years they have functioned well and delivered vast amounts of energy to our community. In later years an extensive review of all sites has been performed, which in turn has led to the initiation of a number of major projects aiming to modernize and if possible increase the power output in existing power stations. In parallel, a new, more modern view on safety has been developed.

A milestone was the development of RIDAS, the power stations guidelines for safety, introduced in 1997. Previously there were different guidelines in different companies. One area that needs to be improved in RIDAS is guidelines for handling existing dams, especially regarding dams that were built decades ago.

The efforts to increase knowledge regarding dam structures and dam safety are continuously ongoing within Vattenfall. It covers purely technical aspects such as measurements, new models, restructuring etc as well as organizational aspects. This dissertation covers the latter.

The subject for this assignment was investigating how dam safety is; i) affected by the plans for imminent implementation of structural changes in the stations and ii) how these changes can best be assessed. When any sort of structural change is made, the integrity of the dam is always affected, either directly or indirectly. In order to capture these affecting factors, it is vital that allsteps in the process are monitored from a safety perspective.

During the process, the scope has expanded to include also the general safety culture within the organization.

Conluscions:

  • There is a need to further develop quality and management systems and also formalize procedures and work processes within Vattenfall Vattenkraft. This is relevant for and affects the whole organization.
  • Dam safety needs to be viewed in a broader perspective, throughout the organization.
  • A modernized approach to safety culture is required, through e.g. followups, incident reports, realitychecks and education.
  • Two specific circumstances need to be managed from a safety perspective; i) Hydropower is an old discipline; i.e. most of all stations were built many years ago. ii) Division of functions & responsibilities such as ownership, maintenance and projects within the organization pose a risk due to lack of a comprehensive overall view.
Place, publisher, year, edition, pages
2009. , 83 p.
Series
TRITA-MT, ABK-MT09-010
Keyword [sv]
dammsäkerhet, risk, säkerhetskultur, ledningssystem, kvalitetssystem, tillförlitlighet, MTO, mänskliga faktorn, RIDAS, vattenkraft
National Category
Philosophy Reliability and Maintenance
Identifiers
URN: urn:nbn:se:kth:diva-84944OAI: oai:DiVA.org:kth-84944DiVA: diva2:499786
External cooperation
Vattenfall Vattenkraft / Vattenfall Power Consultant
Subject / course
Risk and Safety
Educational program
Master of Science in Engineering -Engineering Physics
Presentation
2009-05-27, Seminarierummet, Filosofiska Institutionen, KTH, Teknikringen 78 B, Stockholm, 10:30 (Swedish)
Uppsok
Technology
Supervisors
Examiners
Available from: 2014-05-28 Created: 2012-02-13 Last updated: 2014-05-28Bibliographically approved

Open Access in DiVA

No full text

By organisation
Philosophy
PhilosophyReliability and Maintenance

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 204 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf