Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Risker vid projektplanering: Vad bör prioriteras i planeringsfasen för att undvika att budget och tid överskrids?
KTH, School of Industrial Engineering and Management (ITM), Production Engineering.
KTH, School of Industrial Engineering and Management (ITM), Production Engineering.
2010 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesis
Abstract [sv]

Denna rapport har som syfte att ta reda på vilka de viktigaste faktorerna till att mångaprojekt inte klararbudget och tidplan är och vad man bör lägga vikt på i planeringsfasenför att undvika detta. Ämnet valdes för att många projekt drar över budget och tidplanoch det verkade därför intressant att få lite mer kunskap om varför det är så. Enlitteratursökning gjordes för att få en teoretisk grund i ämnet. För att sedan se vadföretag upplever gjordes två empiriska studier på två olika företag. Rapporten kommerfram till att det är väldigt svårt att hitta alla faktorer utan man bör istället fokusera på deviktigaste och att kunna anpassa sig när det uppkommer hinder. För att kunna göra detmåste planeringen vara avstämbar för att det ska kunna gå att avgöra om rätt saker hargjorts. Det är vikigt att komma ihåg att riskerna kan skilja sig mycket mellan olikabranscher och företag.

Abstract [en]

This report aims to find out the most important factors why many projects fail to meetthe budget and schedule and what to put focus on in the planning phase to avoidthis. The subject was chosen because many projects exceed their budget and time and ittherefore seemed interesting to get a bit more knowledge in why. A literature searchwas made to obtain a theoretical foundation in the subject. To see what companies areexperiencing, two empirical studies on two companies were made. The report concludesthat it is very difficult to find all factors. Project planners should instead focus on thekey factors and be able to adapt when obstacles arise. In order to do that, the plan mustbe tunable for it to be possible to determine whether the right things have been made. It is important to remember that the risks may differ greatly between different industriesand companies.

Place, publisher, year, edition, pages
2010. , 19 p.
Series
Examensarbete inom teknik och management, grundnivå, 74
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:kth:diva-90318OAI: oai:DiVA.org:kth-90318DiVA: diva2:504898
Subject / course
Production Engineering
Uppsok
Technology
Examiners
Available from: 2012-03-12 Created: 2012-02-22 Last updated: 2012-03-12Bibliographically approved

Open Access in DiVA

fulltext(179 kB)1073 downloads
File information
File name FULLTEXT01.pdfFile size 179 kBChecksum SHA-512
2e33eb45f07fed43d03e595e6da9c12bfef4f9d90170061dd42362d185e9d2009e4454057c43d418c70da8c6e6daf14c9c7a5039052d75f7cb1e73bdea98c963
Type fulltextMimetype application/pdf

By organisation
Production Engineering
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 1073 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 304 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf