TIDPLANERING AV PROJEKTERINGSSKEDET I BIM-PROJEKT
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering.
2011 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
Time scheduling of the design phase in BIM-projects (English)
Abstract [sv]

Syfte:

Undersöka vilka möjligheter som finns, för projekteringsledaren, att optimera tidplaneringen i projekteringsskedet och på så sätt dra större fördel av att arbeta med BIM.

 

Frågeställningar:

  • Hur ser det planerade och faktiska aktivitetsflödet, eventuellt även informationsflödet, ut i några av WSP Managements redan utförda BIM-projekt? Vilka åsikter har olika roller i projekten om detta?
  • Vilka problemområden upplever projekteringsledare att det finns i projekteringsskedet i ett BIM-projekt? Finns tendenser till flaskhalsar i vissa projekteringsfaser?
  • Vilka tankar finns i branschen när det gäller möjligheten att tidplanera bättre i projekteringsskedet för att kunna dra större fördel av BIM?
  • Går det att förena tidplanering av projekteringsskedet i BIM-projekt med andra redan inarbetade metoder?

 

Metod:

Insamlandet av fakta till detta examensarbete har skett genom 

en induktiv litteraturstudie samt intervjuer av kvalitativt slag.

 

Slutsatser:

De resultat som framkommit under examensarbetets gång tyder på att optimerad tidplanering av projekteringsskedet i ett BIM-projekt gör att det går att dra större fördel av att arbeta med BIM.

 

Flera av de problem och flaskhalsar som nämns i intervjuerna visar att dessa kan förhindras med bättre tidplanering. Framförallt är det förarbetet, där nytta, mål och BIM-användning identifieras som framhävs som viktigt. Andra förutsättningar som nämns är högre engagemang från projekteringsledaren, att denne bör komma in i ett tidigt skede i projektet och bör samarbeta med någon som har stor kunskap och erfarenhet av BIM.

 

Tidplanen för projekteringsskedet i ett BIM-projekt skiljer sig

från dagens tidplan på så sätt att det är

informationsleveranserna som kommer styra hur de olika

aktiviteterna planeras istället för de handlingar som skapas

idag. Samma metoder och program som används idag kan

användas för tidplanering av ett BIM-projekt. Behovet av att

bryta ner projektet i mindre delar för att studera relationen

mellan de olika aktiviteterna och på så sätt skapa en fungerade

tidplan kvarstår.

 

 

Abstract [en]

Purpose:

Explore the possibilities to optimize the scheduling in the design phase to obtain greater benefits from working with BIM.

 

Problems:

  • What is the planned and actual work flow, possibly including the information flow, in some of WSP Management’s conducted BIM-projects? What are the opinions about this, from the different roles in the projects?
  • Which problem areas are the managers of the design phase experiencing in the design phase of a BIM-project? Are there signs of bottlenecks in some of the stages?
  • What are the thoughts in the industry regarding the possibility to improve the time scheduling of the design phase in order obtain greater benefits from working with BIM.
  • Is it possible to use already established methods for the time scheduling of BIM-projects?

 

Methods:

The collection of data for this thesis has been done through an

inductive literature review and qualitative interviews.

 

Conclusions:

The results from this thesis indicate that optimizing of scheduling leads to greater benefits from working with BIM.

 

Several of the problems and bottle necks that are mentioned

in the interviews shows that they could be prevented with

better time scheduling. Above all it's the initial work, where

the BIM goals and Uses are identified, that are mentioned as

important. Other conditions mentioned are higher

commitment from the design manager, that this person should

come in at an early stage in the project and collaborate with

someone who has extensive knowledge and experience of

BIM.

 

The schedule for the design phase in a BIM-project will be

distinguished from today’s schedule in the way that the

information delivery will control how the various activities

are planned, instead of documents. The same  methods and

programs that are used today can be used for the scheduling

of a BIM-project. The need for a break-down structure in

order to study the relationship between the various activities

still exists in order to make a functioning time schedule.

Place, publisher, year, edition, pages
2011.
Keyword [sv]
BIM, projekteringsledare, projektledare, tidplanering, optimering, ofullständig BIM, BIM-genomförandeplan, aktivitetsflöde, WSP Management.
National Category
Civil Engineering
Identifiers
URN: urn:nbn:se:kth:diva-93485OAI: oai:DiVA.org:kth-93485DiVA: diva2:516432
External cooperation
WSP Management
Uppsok
Technology
Supervisors
Examiners
Available from: 2012-04-18 Created: 2012-04-18 Last updated: 2012-04-18Bibliographically approved

Open Access in DiVA

Evelina Fredin(1364 kB)982 downloads
File information
File name FULLTEXT01.pdfFile size 1364 kBChecksum SHA-512
06726f6e02fe29b48989d4741096a1fa9c4961da3bee810eafbc54f8d24bb329b42ed1609ec59a52f246a9663a1a2576ff2e087bdac42241d89510db2a9d3033
Type fulltextMimetype application/pdf

By organisation
Civil and Architectural Engineering
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 982 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 407 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf