Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Provbassäng för dränkbara pumpar
KTH, School of Industrial Engineering and Management (ITM), Machine Design (Dept.).
2006 (Swedish)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesisAlternative title
Test basin for drainable pumps (English)
Abstract [sv]

Grindex AB tillverkar dränkbara länspumpar och slampumpar. Alla pumpar som tillverkas och

monteras på företaget genomgår en grundlig kontroll. Kontrollen utförs i en provbassäng. Under

provningsförloppet kontrolleras pumpens flöde och tryck vid bestämda punkter. De befintliga

provbassängernas mätteknik anses bristfälliga samt är arbetsmiljön vid dem förbättringsbar. För

att förbättra detta och möjliggöra att fler pumpar kan provas vill Grindex investera i en ny

provutrustning. Dessa förutsättningar ligger till grund för examensarbetet.

Två av de viktigaste kraven som ställdes på den nya utrustningen var; automatisering och storlek.

För att minimera den tid operatören är vid provbassängen ämnas provförloppet göras helt eller

delvis automatiserat. Provförloppet kan delas in i två moment. Under det första momentet ansluts

pumpen till provbassängen och under det andra momentet utförs mätningen.

Efter inledande analys ansågs det inte aktuellt att helt automatisera det första momentet,

anslutningsförloppet. Då lades olika förslag på hur ett semiautomatiskt anslutningsförlopp kan

ske.

Däremot blev det tydligt under arbetets gång att det andra momentet kan enkelt göras helt

automatiserat om rätt komponenter med styrsystem inhandlas, mätningsförloppet.

Ett av de andra kraven på provbassängen var att ytan den tar upp skulle minimeras. För att

optimera ytan provbassängen kräver framfördes olika förslag på lösningar hur en bassäng med

tillhörande rörsystem kan monteras.

Arbetet resulterade i flera lösningsförslag som förbättrar provbassängen samt arbetsmiljön vid

den.

Abstract [en]

Grindex is a manufacturer for submersible pumps. To ensure that the pumps meet the high

demand Grindex has on its products, every pump is thoroughly tested. The tests are performed in

a test basin. The test of the pump always consists of checks of pressure and flow. The existing

test basins are not meeting present demands and the working environment can be enhanced. To

improve the testing and the working environment Grindex is planning to invest in a new test

basin. The above mentioned conditions serve as a base for this thesis.

There are two main demands on the test basin; automation and seize.

The test procedure is intended to be partially or fully automated to be able to meet the first of the

above specified demands of minimizing the operators time with the test.

The test can be divided in to two separated parts; the first phase is to connect the pump to the test

equipments and the second phase is to perform the measuring procedures.

After initial analysis it was clear that the first phase, connecting the pump to the test equipment,

could not be efficiently automated instead a number of proposals have been identified and put

forward of how to partly automate the process.

The second phase, measuring the performance, was identified as been ideal to be automated,

granted the correct equipment including the control system is purchased.

To meet the second demand of seize, a number of proposals have been recommended of how to

minimize the test basin.

The thesis contains a number of prioritized proposals of how to improve the test basin and the

working environment for Grindex.

Place, publisher, year, edition, pages
2006.
Series
MMK 2006:12 MPK 558
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:kth:diva-101143OAI: oai:DiVA.org:kth-101143DiVA: diva2:546524
External cooperation
Grindex AB,Christer Lifwergren
Uppsok
Technology
Supervisors
Examiners
Available from: 2012-08-23 Created: 2012-08-23 Last updated: 2012-08-23Bibliographically approved

Open Access in DiVA

Petter Hällgren(1478 kB)147 downloads
File information
File name FULLTEXT01.pdfFile size 1478 kBChecksum SHA-512
1261eb08cb0eede34d5ce8576ae200d6eff16260169adb0c7e3badadbc15408bc64669512a286c56c4b8c575bc22f0f817442b40f920f9ad146bfd077a6ad8da
Type fulltextMimetype application/pdf

By organisation
Machine Design (Dept.)
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 147 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 72 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf