Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Kostnadskalkyler i byggprocessen: Studie av grundkalkyl
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Building Technology and Design.
2012 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
Cost estimates in the consruction process : Study of early estimates (English)
Abstract [sv]

Produktkalkylering och budgetering är viktiga verktyg i ekonomistyrningen hos företag. Oavsett av vilken marknad eller verksamhet man är aktiv inom så är ett bra sätt att fastställa kostnaderna grundläggande. Det behövs bland annat för att göra investeringsbedömningar och för att utveckla bättre lönsamhet, produktivitet och effektivitet. Det är därför viktigt att göra riktiga kalkyler och att dessa är begripliga samt tillförlitliga för att kunna användas praktiskt när man ska fatta beslut. Kalkylering är en del av ekonomin hos byggföretag, dels används det för att skapa kontroll över kostnader men kalkylering är även en viktig del i byggstyrningen av ett byggprojekt. De projekt som tas upp i denna rapport är byggnation av flerbostadshus i egen regi av företaget JM Bostad Stockholm. Detta arbete beskriver framtagandet av en kalkyl i ett tidigt skede av ett husbyggnadsprojekt med inriktning på anläggningsdelen. Kalkylen har tagits fram för att ge en uppfattning av vad det projekterade underlaget väntas ge för kostnad och används sedan till att budgetera och utvärdera projekterade lösningar. Det upprättas olika kalkyler på samma projekt men i olika skeden beroende på hur långt byggprocessen är gången. Förutsättningar och ändrad utformning kan skilja mellan de olika kalkylskedena.

För att skapa en bedömning av hur tillförlitlig en tidig kalkyl är kommer därför att jämföras den beskrivna framtagna kalkylen med en i senare skede framtagen Produktionskalkyl för samma projekt. För att utvärdera skillnader som kan finnas i beräknade kostnader mellan en tidig Grundkalkyl och den senare efterföljande Produktionskalkylen görs även jämförelser i ytterligare två projekt.

Abstract [en]

Estimating costs and budgeting are important tools in the financial management of a company. Regardless of what market or business one is active within a good way to determine costs is fundamental. It is required, among other things, to make investment decisions and to develop improved profitability, productivity and efficiency. It is therefore important to make proper cost calculations and that they are comprehensible and reliable in order to be practical when making decisions. Cost-estimates are a part of the economy of construction companies and are used to gain control over costs, but cost-estimates is also an important part of the management of a construction project. The projects listed in this report are development of apartment buildings by the company JM Bostad Stockholm. This report describes the development of a cost estimate in the early stage of a housing project with a focus on groundwork and landscape design. The estimate has been developed to give an idea of what cost the produced plans and specifications is expected to generate and then used for budgeting and to evaluate chosen solutions. Different estimates are made on the same project but in different stages depending on how far the building process has proceeded. Conditions and changes in design can distinguish between these different stages.

To get an assessment of how reliable an early estimate is, therefore the described estimate is compared to the later following Production-estimate for the same project. To further evaluate the differences that may exist in the estimated costs of an early Basic-estimate and the latter subsequent Production-estimate comparison is made in two additional projects.

Place, publisher, year, edition, pages
2012. , 39 p.
Keyword [en]
cost estimation, construction process, management control, activity-based costing, cost basis
Keyword [sv]
kostnadskalkylering, byggprocessen, ekonomistyrning, aktivitetsbaserad kostnadskalkylering, kalkylförutsättningar
National Category
Engineering and Technology Civil Engineering
Identifiers
URN: urn:nbn:se:kth:diva-118650OAI: oai:DiVA.org:kth-118650DiVA: diva2:607049
External cooperation
JM AB
Subject / course
Constructional Engineering and Design
Educational program
Bachelor of Science in Engineering - Constructional Engineering and Design
Uppsok
Technology
Supervisors
Examiners
Available from: 2013-02-21 Created: 2013-02-21 Last updated: 2013-02-21Bibliographically approved

Open Access in DiVA

No full text

By organisation
Building Technology and Design
Engineering and TechnologyCivil Engineering

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 1274 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf