KTH, School of Electrical Engineering (EES), Electric Power Systems.
2008 (English)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesis
Abstract [en]

The project was performed in RTE (“Réseau de Transport d’Electricité”), the French Transmission System Operator (TSO) within the Network Optimisation and Development Service (SDOP) that has to plan and direct the development of the regional transmission network (225 and 63 kV). The goal was to carry out a study on the development of the power transmission network until 2030 in a context of increasing demand, in order to match power need in the future. Thus, it consists into the determination of the different constraints (transmission capacity constraints, short-circuit current limitations, voltage stability constraints, environmental constraints…) that might appear in the area of study in the medium-term (2020) and longterm (2030). These constraints were analyzed with the determination of the causes and the calculation of the seriousness (for example power cut and not distributed energy) of the aforementioned constraints. The next step consists in the analysis of several technical and economical solutions to satisfy these constraints. Then, the study results in an investment plan from 2007 to 2030 including the solutions, their costs and their years of investment. Finally, this work was presented, explained and approved by the regional management of RTE.

This master thesis report is divided into four parts: a brief presentation of RTE is given, then the context of study and a prediction of the long-term behaviour of the electrical market are presented, followed by the technical issues and the general tools of the study and finally the consistent results related to the study are explained.

A chart of confidentiality was signed not to transmit the results outside of the company. This report is based on an existing grid, even though the names of the substations have been changed for the sake ofconfidentiality.

Place, publisher, year, edition, pages
2008. , 53 p.
EES Examensarbete / Master Thesis, XR-EE-ES 2008:002
National Category
Electrical Engineering, Electronic Engineering, Information Engineering
URN: urn:nbn:se:kth:diva-119232OAI: diva2:609994
Available from: 2013-03-12 Created: 2013-03-08 Last updated: 2013-03-12Bibliographically approved

Open Access in DiVA

fulltext(949 kB)98 downloads
File information
File name FULLTEXT01.pdfFile size 949 kBChecksum SHA-512
Type fulltextMimetype application/pdf

By organisation
Electric Power Systems
Electrical Engineering, Electronic Engineering, Information Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 98 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 63 hits
ReferencesLink to record
Permanent link

Direct link