Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Tidplanering av ett stort byggprojekt: En kvalitativ intervjubaserad studie av Nya Karolinska Solna
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Building Technology and Design.
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Building Technology and Design.
2013 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
Time planning for a large scale project : A qualitative interview based study on New Karolinska Solna (English)
Abstract [sv]

Detta examensarbete, Tidplanering av ett stort byggprojekt är en fördjupning inom byggstyrning med fokus på hur planeringsarbetet kan förbättras. Rapporten baseras på Skanskas planeringsarbete av Nya Karolinska Solna. Fördjupningen bygger på kvalitativa intervjuer med personal ur utvalda projektfaser och erforderliga dokument, som ger en närmare inblick i hur arbetet med tidplanering utförs och kommuniceras. Arbetet resulterade i slutsatsen att ledningsverktyget Last planner får samtliga befattningar på byggarbetsplatsen att kommunicera bättre med varandra och uppmärksammar eventuella problem i god tid. Skanska rekommenderas därför att implementera Last planner i framtida projekt. Skanska bör avsätta mer tid för projektering innan produktionen påbörjar. Detta gör att de minskar risken för förseningar i sina projekt. Tillämpning av 4D‐odeller förenklar förståelsen för hur projektet utvecklas under arbetets gång i jämförelse med det planerade arbetet. Därför kan Skanska med fördel använda sig utav 4D-modellering inom framtida projekt. Skanska rekommenderas att ta fram arbetsmallar för 4D-modelleringen och till stöd för framställandet av 3-veckorstidplaner, där det framgår hur de använder vissa funktioner i planeringsprogrammen samt riktlinjer för hur tidplaner ska utformas. Vi rekommenderar att planerare ges möjligheten att hålla återkommande möten för erfarenhetsutbyte. Även om faserna skiljer sig åt, kan planerare använda sig av varandras erfarenheter i framtida projekt och det är ett bra sätt att bibehålla kunskapen inom Skanska.

Abstract [en]

This thesis is an in-depth study of building management focusing solely on time planning of a large-scale building project. The report is based on planning within New Karolinska Solna, a project by Skanska. The study was conducted through qualitative interviews on site as well as acquiring necessary documents in relation to the thesis subject. The material that was gathered gave insight into how the time plans are produced  and communicated. This brought about the conclusion that Last planner, a communications method, should be implemented in future Skanska projects as it is a holistic approach to communicating time plans by involving all involved in the project.  The design team should be given more time to finish all necessary drawings before construction work begins. This will result in a decrease of delays caused by lack of drawings. Applying the use of 4D-models clarifies, in a generally understandable way, the development of the construction work in comparison to what was initially planned. Therefor, the usage of such models is an advantage for use in future projects. Develop working templates for 4D-models, and as support for producing 3-week look-ahead time plans, with  clear guidelines for the layout of time plans as well as how certain functions are used within planning programs. We recommend that the planners be given the opportunity to hold regular meetings to exchange ideas and individual experience, even though phases may differ from each other. This would be a positive step in maintaining knowledge within Skanska.

Place, publisher, year, edition, pages
2013. , 103 p.
Keyword [en]
record, NKS, New Karolinska Solna, planning, Skanska, time planning
Keyword [sv]
avstämning, NKS, Nya Karolinska Solna, planering, Skanska, tidplanering
National Category
Civil Engineering
Identifiers
URN: urn:nbn:se:kth:diva-127663OAI: oai:DiVA.org:kth-127663DiVA: diva2:644831
External cooperation
Skanska AB
Educational program
Bachelor of Science in Engineering - Constructional Engineering and Design
Uppsok
Technology
Supervisors
Examiners
Available from: 2013-09-02 Created: 2013-09-02 Last updated: 2013-09-02Bibliographically approved

Open Access in DiVA

fulltext(7419 kB)3571 downloads
File information
File name FULLTEXT01.pdfFile size 7419 kBChecksum SHA-512
7b4637cbd3fbf060b1b6b03ee2e8e93b80e78d2537e04b074a0ccb157e8c993b2d9e1636fec9d17945ce247c90bb2691912b186f4751913c0bd26249f134f969
Type fulltextMimetype application/pdf

By organisation
Building Technology and Design
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 3571 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 455 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf