Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
FEASIBILITY STUDY OFSTAND-ALONE SMALL-SCALE DIGESTION SYSTEMSTO PRODUCE BIOGAS FOR LOCAL USE
KTH, School of Industrial Engineering and Management (ITM), Energy Technology.
2012 (English)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesis
Abstract [en]

The purpose of this project was to carry out a feasibility study of implementing a small-scale biogas plant on KTH campus using food wastes from the neighbouring restaurants and KTH kitchens as input substrate, where the biogas produced could be used in the Energy laboratory, to run the micro turbine, as an example. Considering that KTH has 10 departments and that each department has its own kitchen, the amount of food wastes that can be recuperated for input to the plant is around 225 kg per day for a normal working week, requiring a 10m3 biogas plant.

This report also relates to the potential implementation of small-scale biogas plants on farms in Mauritius using manure and crop endings as input substrate as a solution to the waste management problems the farmers are currently facing as well as using the biogas to provide energy for cooking and heating.

Based on the quantity of food wastes available from the neighbouring restaurants, the sizing of the proposed biogas plant was calculated and the best technical and commercial options were considered.

An experimental biogas plant was setup on the campus and the planning and logistics involved were studied as well as the potential quantity and quality of gas produced from food wastes. The optimal biogas production for a 5 m3 capacity biogas plant and processing food wastes is 6 to 10 m3 of biogas per day composed of about 68-72% methane. But, since the experiment was run for only a two-week period, the optimum biogas production could not be reached. Several operational and biological problems were encountered during the operation of the plant. However, the output of the experiment is positive as the logistics required for the setting up and running of a biogas plant on campus or elsewhere including the technicality of such a plant and the human resources requirements have been deduced from the lessons learned.

Place, publisher, year, edition, pages
2012. , 59 p.
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:kth:diva-137368OAI: oai:DiVA.org:kth-137368DiVA: diva2:678792
Subject / course
Sustainable development
Educational program
Master of Science - Sustainable Energy Engineering
Supervisors
Examiners
Available from: 2016-03-15 Created: 2013-12-13 Last updated: 2016-03-15Bibliographically approved

Open Access in DiVA

Report_Eustasie_Janet_EGI-2012-042MSC-EKV891(3101 kB)377 downloads
File information
File name FULLTEXT01.pdfFile size 3101 kBChecksum SHA-512
4110ac6897eeeacbd4a83ff509ec745f6595e8d8d7df9dd369e34a10d02aa8c660c15f441f2a691a8a65564e014615d21ee3781a1309b1931776ebcc2bf21098
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Eustasie, Marie Janet
By organisation
Energy Technology
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 377 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 172 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf