Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Spårvägskonstruktioner: Underlätta valet av spårvägskonstruktion
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Building Technology and Design.
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Building Technology and Design.
2014 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
Tramway constructions : To help with the choice of tramway construction (English)
Abstract [sv]

Stockholms spårvägar växer i allt snabbare fart, och det är allt fler kommuner som är intresserade av den typen av transportmedel. Något som idag är en brist inom spårvägsindustrin i Stockholm är kunskap och erfarenhet om spårvägsämnet. Drift och underhåll har varit minimal eftersom det inte har prioriterats sedan Tvärbanan öppnades. Detta har lett till för tidig reinvestering av gatuspår i mångmiljonbelopp.

Då det förekommer olika förutsättningar som måste tas hänsyn till i form av buller, mån om plats och geoteknik finns det många konstruktioner att välja mellan när en spårväg ska byggas. Denna rapport har som syfte att underlätta val av spårvägsinvesteringar i framtiden. Det har också som mål att bidra med kunskap om hur viktigt det är med drift- och underhåll och att det inte bör snålas in på den aspekten. En begränsning har gjorts till fem spårvägskonstruktioner som förekommer i Stockholm och vanligtvis i Göteborg och Norrköping. För att få en förståelse för hur konstruktionerna är uppbyggda redogörs en beskrivning av dem i rapporten. 

Rapporten inleds med hur det historiskt har sett ut med spårvägar, nedläggning av dem och återinvestering i Stockholm. Dessa år av glapp mellan nedläggning och återinvestering i Stockholm visar på hur mycket kunskap som har glömts bort och som måste fås tillbaka för framtida investeringar. En analys kring placering av de olika konstruktionerna, hur varierande för- och nackdelarna och kostnaderna är avslutar rapporten. Mycket av rapporten bygger på litteraturstudier på tidigare rapporter som har kompletterats med kontinuerliga möten med handledare och kontakt med personer från olika kommuner och företag i Sverige för att inhämta trovärdig information.

 

Abstract [en]

The tramways of Stockholm are growing at an increasing rate and so is the number of municipals interested in that type of transportation.  In Stockholm’s tramway industry there is currently a lack of knowledge and experience on the subject of tramways. Drift and maintenance has been minimal due to lack of prioritization since Tvärbanan was opened. This has led to a premature reinvestment of millions of SEK for road tracks.

Due to different presumptions that have to be taken into account such as noise, considerations of room and geoscience, there are many different constructions to choose from when a tramway is to be built. This report’s purpose serves to facilitate choice of tramway investments in the future. Another goal of the report is to contribute with knowledge of how important service and maintenance of tramways is and why shying away from spending money on these matters is bad. For the purpose of this report a restriction has been made, five tramway constructions will be looked at, these are present in Stockholm but also in Göteborg and Norrköping. To acquire an understanding of how the constructions are built, a description of these is accounted for in the report.

The report starts off with a historical perspective on tramways, closure of them and reinvestment of them in Stockholm. The years of gaps between closure and reinvestment in Stockholm shows how much knowledge has been forgotten and has to be reacquired for future investments. In the end of the report an analysis, about placement of the different constructions, how varied the pros and cons are and the costs of these, is presented. Much of the report is based on literature studies of earlier reports and has been complemented with continuous meetings with tutors and contact with people from different municipals and companies in Sweden to obtain trustworthy information.

Place, publisher, year, edition, pages
2014. , 45 p.
Keyword [en]
drift and maintenance, tramway, tramway constructions, tramway material, facilitate
Keyword [sv]
drift och underhåll, spårväg, spårvägskonstruktioner, spårvägsmaterial, underlätta
National Category
Civil Engineering
Identifiers
URN: urn:nbn:se:kth:diva-147508OAI: oai:DiVA.org:kth-147508DiVA: diva2:730163
External cooperation
Trafikförvaltningen Stockholms Läns Landsting
Educational program
Bachelor of Science in Engineering - Constructional Engineering and Design
Supervisors
Examiners
Available from: 2014-06-27 Created: 2014-06-27 Last updated: 2014-06-27Bibliographically approved

Open Access in DiVA

fulltext(1344 kB)400 downloads
File information
File name FULLTEXT01.pdfFile size 1344 kBChecksum SHA-512
8e6f6bd7e10861b17c69cf099ca984821dbd18d9ad40f4f51aebf89464eb63c01491df60aa815956a63c0afe2cad0a4c95694c2b037d47a2f2b972f6cf254b1c
Type fulltextMimetype application/pdf

By organisation
Building Technology and Design
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 400 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 186 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf