Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Effektivisering vid produktion av järnvägsbro
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Building Technology and Design.
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Building Technology and Design.
2014 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
Efficiency in production of railway bridge (English)
Abstract [sv]

Järnvägsbron vid Årstaberg kommer när den är klar att mäta 1,4 km, här passerar över 550 tåg per dygn. Bron är en del av projektet Citybanan och kommer att fungera som en spårväxel som styr fjärr-, regional- och godståg till den gamla östra Årstabron. Pendeltågen kommer då färdas på bron över Årstaviken och in i den nya järnvägstunneln vid Södra station.

Entreprenaden gick från början till danska företaget Pihl och Son som efter en del problem gick i konkurs, underentreprenören Züblin fick då ta över projektet. Med en ny platsledning gjordes en hel del förändringar på arbetsgången och arbetsmomenten. Från 4 veckor per sektion, där en sektion mäter ca 30 meter lyckades Züblin tillslut effektivisera till 2 veckor. Det speciella med detta projekt är den formvagn som används, den så kallade MSS:en (Moving Scaffolding System) som är relativt ovanlig i Sverige. Författarnas uppgift var att undersöka och utreda för ytterligare effektiviseringar samt redogöra för de effektiviseringar som redan gjorts av Züblin.

För att ta reda på hur arbetsgången går till har en sektion av överbyggnaden följts under byggprocessen. Författarna har tagit del av tekniska detaljer som temperatursprickor, armering, spännarmering, betongkvalité och inte minst själva formvagnen. För att få en uppfattning granskades dokument och handlingar om projektet parallellt med intervjuer med inblandade och sakkunniga.

Eftersom många effektiviseringsåtgärder var genomförda när författarna påbörjade examensarbetet hos Züblin lämnades inte mycket utrymme för effektiviseringar av tekniska åtgärder. Effektiviseringar som författarna har kommit fram till gäller främst arbetsmetoder och material där mer prefabricering på armering och formning över brostöd, användning av rullarmering och självkompakterande betong. Med tanke på att inga tester och provningar har utförts är detta spekulationer som tagits i samråd med inblandade nyckelpersoner med stor erfarenhet inom sina respektive områden.

Abstract [en]

The railway bridge at Årstaberg will measure 1,4 km when finished, over 550 trains passes by every 24 hours. The bridge is a part of the project Citybanan and will serve as a railway gear that directs the long-distance, regional- and cargo trains to the old Årstabron. The commuter trains will then travel on the bridge over Årstaviken and into the new railway tunnel at Södra Station.

The first contractor was the Danish company Phil & Son, who after some struggles and problems went bankrupt. The subcontractor Züblin then took over the project. With the new site management, whole new changes were made considering the workflow and other operations. From 4 weeks per section, were one section measures 30 meters, Züblin managed to reach 2 weeks. The authors' task was to investigate for further efficiency and account for the efficiency improvements already made by Züblin.

In order to receive a full understanding about the workflow on sight, every step of the process has been followed on one section of the superstructure under the construction process. The technical details have been analyzed such as temperature cracks, reinforcement, stressing and concrete quality. Documents about the project had to be examined and interviews with the involved experts and thoroughly follow the operations on site.

Since many efficiency measures were implemented when the authors began this degree project at Züblin, not much space was left for technical efficiency improvements. The efficiencies that caught the attention is mostly working methods and material use where more prefabrication should be utilized considering the reinforcement and forming over pillars, use of rolled reinforcement and self- consolidating concrete. Considering no tests or try-outs have been made this is only speculations which have been discussed with the involved experts with great experience in their field.

Place, publisher, year, edition, pages
2014. , 55 p.
Keyword [en]
MSS, efficiency in bridge production, Lean, Lean Construction, prefabrication, industrialization, thermal cracks
Keyword [sv]
MSS, effektivisering vid brobyggnad, Lean, Lean Construction, prefabricering, industrialisering, temperatursprickor
National Category
Civil Engineering
Identifiers
URN: urn:nbn:se:kth:diva-147511OAI: oai:DiVA.org:kth-147511DiVA: diva2:730195
External cooperation
Züblin Scandinavia AB
Educational program
Bachelor of Science in Engineering - Constructional Engineering and Design
Supervisors
Examiners
Available from: 2014-06-27 Created: 2014-06-27 Last updated: 2014-06-27Bibliographically approved

Open Access in DiVA

fulltext(11438 kB)377 downloads
File information
File name FULLTEXT01.pdfFile size 11438 kBChecksum SHA-512
f34da42b4194731ddace5b21f34822d664ca2135432c17fe848846754a94835f36c1f75ec78cf30868c00688fe3fb928df17e896ed1068d2a5906e7f2b0eeb64
Type fulltextMimetype application/pdf

By organisation
Building Technology and Design
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 377 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 368 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf