Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Installationssamordning i projekteringsskedet: Möjligheter till förbättring genom att utveckla en beskedstidplan
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Building Technology and Design.
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Building Technology and Design.
2014 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
Building services coordination during the design phase : Possibilities of improvement by developing a notification plan (English)
Abstract [sv]

Denna rapport redovisar möjligheterna till en förbättrad installationssamordning genom att utveckla en beskedstidplan. Rapporten behandlar problem inom installationssamordning i projekteringsskedet av ett byggnadsprojekt. Arbetet är utfört på uppdrag av teknikkonsultföretaget ÅF.

Det har sedan länge funnits stora problem inom installationssamordningen. Utmaningar som finns i branschen är bland annat bristande kommunikation, vilket kan leda till kollisioner, förseningar och i slutändan extra kostnader. Den bristande kommunikationen handlar delvis om avsaknad av besked från beställare eller andra projektörer om beslut som måste tas. Detta kan leda till att konsulternas arbete ej kan fortskrida. Inom ÅF finns det idéer som innebär att problemet kan lösas genom att utveckla en beskedstidplan.

För att undersöka denna hypotes har empirisk data, med hjälp av intervjuer, samlats in och analyserats. Parallellt med intervjuerna har även en beskedstidplan utvecklats. Rapporten baseras även på litteraturstudier där böcker och rapporter som behandlar installationssamordning har granskats. Resultatet är baserat på det utkast av beskedstidplanen vi tagit fram och de synpunkter som inhämtats på den under intervjuerna.

Analysen av intervjuerna tyder på att många problem inom installationssamordning kan minskas genom att använda en enkelt utformad och användarvänlig beskedstidplan. Våra slutsatser visar att den utvecklade beskedstidsplanen är tillämpbar inom ÅF och andra företag inom branschen.

Abstract [en]

This thesis focuses on investigating opportunities regarding enhancing building service coordination by developing a notification plan. The thesis addresses problems within building services coordination during the pre-installation phase of a construction project.

The thesis is performed at the request of ÅF, a technical consultancy firm. For a long time there have been problems within building service coordination. Current challenges involve lack of communication, which often steers the project towards collisions and higher latency, resulting in higher costs. This lack of communication partly depends on the lack of clearance from the client or other projectors, when there is a decision that has to be made. This might lead to that consultants no longer will be able to work. Current ideas within ÅF to solve this problem involve the development of a notification plan.

The method being used in this thesis involves the gathering and analysis of data. Sources are mainly interviews and literature concerning building service coordination. Simultaneously with interviewing a notification plan has been developed. The results are based on the draft of this notification plan and comments given during interviews.

The analyses of interviews often concur that a lot of problems within building service coordination can diminish by using a simple and user-friendly notification plan. Our conclusions shows that the developed notification plan is applicable both at ÅF, but also at other companies within this sector.

Place, publisher, year, edition, pages
2014. , 43 p.
Keyword [en]
building services coordination, notification plan, design, consultants, prototyping
Keyword [sv]
installationssamordning, beskedstidplan, projektering, konsulter, prototyputveckling
National Category
Civil Engineering
Identifiers
URN: urn:nbn:se:kth:diva-149278OAI: oai:DiVA.org:kth-149278DiVA: diva2:738749
External cooperation
ÅF AB
Educational program
Bachelor of Science in Engineering - Constructional Engineering and Design
Supervisors
Examiners
Available from: 2014-08-19 Created: 2014-08-19 Last updated: 2014-08-19Bibliographically approved

Open Access in DiVA

fulltext(9376 kB)366 downloads
File information
File name FULLTEXT01.pdfFile size 9376 kBChecksum SHA-512
ad723e1cbeca581d7c757e729840ffb98b24edd395852bae445b10be785f02865bf3bdcb431be093e9a6752f028cd49ce4e10b6267c9de092b72f6952f062977
Type fulltextMimetype application/pdf

By organisation
Building Technology and Design
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 366 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 1804 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf