Change search
ReferencesLink to record
Permanent link

Direct link
How can Earned Value Management and Lean help to maintain the ex-ante agreed shape of the ‘project management triangle’ in the construction industry?
KTH, School of Industrial Engineering and Management (ITM), Applied Mechanical Engineering (KTH Södertälje).
2014 (English)Independent thesis Advanced level (degree of Master (One Year)), 10 credits / 15 HE creditsStudent thesis
Place, publisher, year, edition, pages
National Category
Engineering and Technology
URN: urn:nbn:se:kth:diva-152212OAI: diva2:749216
Educational program
Master of Science - Project Management and Operational Development
Available from: 2014-09-23 Created: 2014-09-23 Last updated: 2014-09-23Bibliographically approved

Open Access in DiVA

fulltext(1360 kB)619 downloads
File information
File name FULLTEXT01.pdfFile size 1360 kBChecksum SHA-512
Type fulltextMimetype application/pdf

By organisation
Applied Mechanical Engineering (KTH Södertälje)
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 619 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 193 hits
ReferencesLink to record
Permanent link

Direct link