Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Model based construction process management
KTH, Superseded Departments, Real Estate and Construction Management.
1998 (English)Doctoral thesis, monograph (Other scientific)
Abstract [en]

The purpose of this research was to study how the data management of a main contractor can be improved, in order to provide better client value and more cost-efficient production. The research focused on methods for reengineering the information management using product modelling as enabling technology.

The metbods were tested in pilot tests in which the developed cost and value engineering prototype application was used.

This thesis demonstrates an integration of design and production planning based on the product model approach. The final outcome is that the main contractor can utilise information coming from designers as input in its own tendering and cost estimation applications.

The key methodology used for describing the information management process throughout the building process life-cycle was IDEFO. The analysis of the cur rent process (as-is), in the form of an DEFO model, helped in identifying the main problems of current practice. The target process (to-be) definition was based on product model utilisation and takes into account the possibilities for process reengineering supported by product data technology. One specific re quirement was deemed important in view of the anticipated developments in the area of data exchange; the target system should be structured in such a way that it could easily be adapted to receive data according to the emerging IFC core model schemas.

The overall result of the research reported in this thesis is that the product model approach can be used for a substantially reengineered information man agement process of a main contractor, especially in design and construct type contracts.

Place, publisher, year, edition, pages
Institutionen för fastigheter och byggande , 1998. , 136 p.
Identifiers
URN: urn:nbn:se:kth:diva-2676ISBN: 91-7170-301-2 (print)OAI: oai:DiVA.org:kth-2676DiVA: diva2:8357
Public defence
1998-09-14
Note
NR 20140805Available from: 2000-01-01 Created: 2000-01-01Bibliographically approved

Open Access in DiVA

fulltext(5170 kB)1756 downloads
File information
File name FULLTEXT01.pdfFile size 5170 kBChecksum MD5
151f95a6d4798b1b076b0f571fbd44453b80cee4d97ca91b8385abdb0c5b33e223c66676
Type fulltextMimetype application/pdf

By organisation
Real Estate and Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 1756 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

isbn
urn-nbn

Altmetric score

isbn
urn-nbn
Total: 1110 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf