Commissioning the Heating and Cooling Systems on an FPSO (Floating Production Storage and Offloading facility)
KTH, School of Industrial Engineering and Management (ITM), Energy Technology, Heat and Power Technology.
2015 (English)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesis
Abstract [en]

The project under discussion is the FPSO Ichthys. The FPSO is a ship comprising the offshore production facility for an oil&gas field, financed by INPEX/Total. An oil platform extracts the product received via the flexible risers and separates it into gas and condensate. The condensate is transferred to the FPSO, which processes it, and separates it between natural gas and oil. The oil is stored in the FPSO and then exported via a tanker. The gas is transferred via a pipeline.

An FPSO is a complex installation in many respects. It is a condensate treatment factory, installed on a 450-metre-long ship. It should have the capacity to store one week’s condensate production. The FPSO is self-sufficient in terms of energy production (electricity, heating and cooling). Owing to the proximity of the hazardous production area to the living quarters, strict safety regulations are applied. For instance, all equipment has to be designed with redundancy (2x50% or 3x33% for critical equipment); the heating and cooling systems are managed with the help of emergency logic diagrams. These enable vital functions to be maintained even in cases of extreme failure.

Despite its complexity, the FPSO has to be constructed within a short period of time. However, safety issues are important, and maintenance of defective equipment is expensive since the ship will be located 300km away from the coast. This is the reason why the constructor contracted Actemium, a part of VINCI Energies. Actemium commissions the FPSO. The commissioning mission has to prove that the systems function in accordance with the designs. Commissioning occurs right after the pre-commissioning (de-energized verifications). Commissioning is divided into three main activities: functional tests (which prove that individual pieces of equipment work in accordance with the designs); operational tests (which prove that all subsystems work in accordance with the designs of different modes); and piping and vessels pressurization (which prove that there is no leak).

This master thesis describes the requirements of such projects and focuses on the operational tests. A description of the installation is detailed. Secondly, the subcontractor for the commissioning of the project, Actemium, and the method used for the commissioning are presented thereafter. Finally, the operational test procedures of the cooling and heating systems are examined in detail.

Place, publisher, year, edition, pages
2015. , 55 p.
National Category
Energy Engineering
Identifiers
URN: urn:nbn:se:kth:diva-172775OAI: oai:DiVA.org:kth-172775DiVA: diva2:849382
External cooperation
Actemium/TOTAL
Supervisors
Examiners
Available from: 2015-09-03 Created: 2015-08-28 Last updated: 2015-09-03Bibliographically approved

Open Access in DiVA

fulltext(4486 kB)1796 downloads
File information
File name FULLTEXT01.pdfFile size 4486 kBChecksum SHA-512
e2a8e7a1094e648d445796960e4f6b3c388a4277e3abc8a8eedb117cc0c1bebd1caa5737ab58ad2c5226056eaa4899c9c99633d7009a224bafe3a0bb00f9cb01
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Adolphe, Cyril
By organisation
Heat and Power Technology
Energy Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 1796 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 290 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf