Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Frånluft i väntan på bergvärme
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering.
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering.
2010 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
Exhaust air awaiting geothermal heating (English)
Abstract [sv]

När minskade energikostnader står i fokus väljer flera bostadsrättföreningar och hyresvärdar att använda sig av värmepumpar vid uppvärmning av sina fastigheter. Fjärrvärmen har ofta högre uppvärmningskostnader än exempelvis bergvärme.

Med tanke på att övergången från fjärrvärme till bergvärme inte alltid kan ske omedelbart t ex på grund av fjärrvärmedistributörens uppsägningstider, så kan man välja att då börja med att återanvända frånluften i fastigheten först. Detta kan ske genom att installera en frånluftsvärmepump i fastigheten.

Samma frånluftsvärmepump kan sedan användas som en kompletterande värmekälla om fjärrvärmen frånkopplas helt och bergvärme installeras i fastigheten. Den ska då på ett bra sätt kunna integreras med bergvärmepumpen såväl rörmässigt som styrmässigt och ekonomiskt.

I rapporten har ett exempelområde i Sickla undersökts, energi- och kostnadsberäkningar har gjorts.

Resultatet visar att det kan vara lönsamt att följa strategin fjärrvärme till (fjärrvärme + frånluftsvärme) till (frånluftsvärme + bergvärme).

Abstract [en]

This research paper focuses on the reduction of energy through the use of heat pumps.

District heating often results in higher heating expenses when compared to geothermal heating. Due to the district heating distributors notice periods, the transition to geothermal heating cannot always be done immediately. Therefore, during this time, it is possible to re-use the exhaust air from the building by installing an exhaust air heat pump.

The exhaust air heat pump can be used as a supplementary heat source if the district heating is switched off and a geothermal heat pump is installed which acts like a primary heat source.

In this report, energy and cost estimates have been calculated to find the most effective solution. The payback period has been used to obtain suitable solutions while considering capacity and price. The results show, that it will be beneficial to replace the district heating system which is being used today and replace it with a geothermal heat pump.

Place, publisher, year, edition, pages
2010. , 35 p.
National Category
Civil Engineering
Identifiers
URN: urn:nbn:se:kth:diva-174090OAI: oai:DiVA.org:kth-174090DiVA: diva2:857781
External cooperation
Valvet Förvaltning AB
Educational program
Bachelor of Science in Engineering - Constructional Engineering and Design
Supervisors
Examiners
Available from: 2015-10-02 Created: 2015-09-30 Last updated: 2015-10-02Bibliographically approved

Open Access in DiVA

No full text

By organisation
Civil and Architectural Engineering
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 200 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf