Platsledningens påverkan att minska avvikelser i ett byggprojekt: En fallstudie i ekonomiska avvikelser och platsledningens påverkan på utfallet
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering.
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering.
2015 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
The influence of the site management to reduce deviations in construction projects : A case study of the economic deviations and the effect of the site management outcome (English)
Abstract [sv]

Examensarbetet är en fallstudie där en undersökning utförs kring varför det verkliga utfallet överstiger produktionskalkylen i ett byggprojekt och hur platsledingen kan påverka utfallet.  

Syftet med arbetet är att belysa vikten av en väl fungerande platsledning samt vikten av att ta fram noggranna kalkyler för att hålla budgeten i ett byggprojekt.

Detta uppnås genom en fallstudie där ekonomiska avvikelser identifieras och orsaker till dessa fastställs. Orsakerna till avvikelserna kategoriserades enligt följande:

  • Kalkyleringsfel

  • Kontofel

  • Ändring av metod

  • Tillval

  • Hantering

De resultat som uppnåtts visar att den största orsaken till avvikelser sker på grund av felkalkylering, följt av metodbyte. Den största enskilda orsaken fastställdes som kalkylering av systemform, som används vid gjutning av betong. I snitt ökade kostnaden med 340 % vilket resulterat i en felräkningskostnad om ca 870 000: -.  Vidare fastställdes att platsledningen kan påverka de totala avvikelserna i ett byggprojekt med ca 40 %.

Sammanställning av den intervju som genomfördes för platsledningen på de granskade projekten visar att den största orsaken till avvikelser ligger i bristande projektering.

De rekommendationer som ges är att vara konsekvent vid kontering så att rätt kostnad hamnar på rätt konto, det förenklar avstämningar och prognoser.  Arbeta för en dynamiskgrupp där det finns ledaregenskaper, administrativa kunskaper och byggtekniska kunskaper.

Abstract [en]

The thesis is a case study in which a survey is carried out on why the actual result exceeds production estimate of construction projects and how the site management can affect the outcome.

The aim is to highlight the importance of a well-functioning site management and the importance of obtaining accurate calculations in order to keep the budget in a construction project.

This is achieved through a case study where economic deviations are identified and causes of these sets. The causes of deviations were categorized as follows:

  • Calculation errors
  • Account error
  • Change in method 
  • Option
  • Management

The results obtained show that the major cause of deviations is due to miscalculation, followed by the change in method. The biggest single cause was identified as costing systems form, which is used in casting of concrete. The average cost increased by 340% which resulted in a miscalculation by 870 000:-. Furthermore was determined that the site management has the authority to affect the total deviations of a construction project by about 40%.

Summary of the interview, which was conducted for the site management on the projects audited shows that the biggest cause of deviations is the lack of planning.

The recommendations given are to be consistent in posting, so that the right cost is at the correct account, it simplifies reconciliation and predictions. Working for a dynamic group where there are leadership skills, administrative skills and build technical knowledge.

Place, publisher, year, edition, pages
2015. , 49 p.
Keyword [en]
Production costing, Deviation, Account, Leadership, Site management
Keyword [sv]
Produktionskalkyl, Avvikelse, Konto, Ledarskap, Platsledning
National Category
Civil Engineering
Identifiers
URN: urn:nbn:se:kth:diva-174369OAI: oai:DiVA.org:kth-174369DiVA: diva2:859312
External cooperation
Peab AB
Educational program
Bachelor of Science in Engineering - Constructional Engineering and Design
Supervisors
Examiners
Available from: 2015-10-08 Created: 2015-10-06 Last updated: 2015-10-08Bibliographically approved

Open Access in DiVA

fulltext(4637 kB)165 downloads
File information
File name FULLTEXT01.pdfFile size 4637 kBChecksum SHA-512
1b10f802de5a1e223fdaf1a7c8367837c91df6cfc91759dbeef1a8bd247e4ce8172d312fa8bbdc746bb9a1454cc2272a93282e83dd89ed31afc3478bfcf27baf
Type fulltextMimetype application/pdf

By organisation
Civil and Architectural Engineering
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 165 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 184 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf