Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Platschefens arbete i total- och generalentreprenad
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering.
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering.
2015 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
Site managers’ work in turnkey and general contract (English)
Abstract [sv]

Problemformulering:  Hur påverkas platschefen i sitt arbete i ett byggprojekt utifrån entreprenadformerna total- och generalentreprenad? Hur kan platschefens arbete utformas och avgränsas för att förbättra ledningen av ett byggprojekt utifrån aktuell entreprenadform?

 

Syfte:                            Syftet med studien är att undersöka hur platschefens arbete påverkas av total- och generalentreprenad och sedan presentera förslag på hur det kan utformas utifrån aktuella entreprenadformer.

 

Metod:                          Metoden är en kvalitativ analys. Intervjuer är huvudsakliga tillvägagångssättet och sju platschefer och en affärsområdeschef har intervjuats. Litteraturstudier av tidigare examensarbeten och forskningsrapporter samt skrifter och artiklar från branschen har studerats.

 

Slutsatser:                    Det finns viktigare faktorer för platschefens arbete än själva entreprenadformen i sig. Dessa är bl.a. kvaliteten på handlingarna, projektets storlek, arbetslagets erfarenheter och sammansvetsning, den egna organisationen och tillgängliga stödresurser samt platschefens egna erfarenheter och kunskaper. Entreprenadformen är dock inte utan betydelse. I en totalentreprenad bör platschefen ges möjlighet till att delta i projekteringen för att kunna bidra med sina praktiska byggkunskaper och styra handlingarna mot att bli produktionsvänligare. I en generalentreprenad bör en organisation för hantering av ÄTA-arbeten finnas då det tar mycket tid från platschefen och entreprenören tappar pengar på ÄTA eftersom dem generellt är dåliga på att ta betalt för ÄTA.

Abstract [en]

Problem:                      How is the job of the site manager effected by the contract forms turnkey and general contract? How can the work of the site manager be designed and defined based on the contract form?

 

Purpose:                       The purpose of this essay is to study how the site managers’ work is effected by turnkey and general contract and to present suggestions on how the site managers’ work can be designed based on the contract form.

 

Method:                       The method is qualitative analysis. Interviews are the main approach and seven managers and a business area manager were interviewed. Literature studies of previous theses and research papers as well as publications and articles from the construction industry have been studied.

 

Conclusion:                  There are more important factors for site managers’ work than the contract form itself. These include the quality of the drawings and documents, the size of the project, the work teams’ experience and how well they function as a team, the organization and the available support resources and the site managers’ own experience and knowledge. The contract form is however not without significance. In a turnkey, the site managers should be given the opportunity to participate in the project design and planning in order to contribute with their practical building skills and guiding documents to be more construction-friendly. In a general contract there should be an organization for the management of CAW because it takes a lot of time from the site manager and entrepreneurs lose money on CAW because contractors generally are bad at charging for CAW.

Place, publisher, year, edition, pages
2015. , 28 p.
Keyword [en]
Site manager, turnkey, general construction contract, contractor, production, project design, client.
Keyword [sv]
Platschef, totalentreprenad, generalentreprenad, entreprenör, produktion, projektering, beställare.
National Category
Civil Engineering
Identifiers
URN: urn:nbn:se:kth:diva-174833OAI: oai:DiVA.org:kth-174833DiVA: diva2:859443
External cooperation
Byggnadsfirman Viktor Hanson AB
Educational program
Bachelor of Science in Engineering - Constructional Engineering and Design
Supervisors
Examiners
Available from: 2015-10-07 Created: 2015-10-07 Last updated: 2015-10-07Bibliographically approved

Open Access in DiVA

fulltext(438 kB)415 downloads
File information
File name FULLTEXT01.pdfFile size 438 kBChecksum SHA-512
33591467220d76d4fced3697f8be2255efd5e9b51991d2d4edd8c8c7e5b45441b130b4f22474427d5393d0b0fd65520387bd3b005b4ce49368a88e41011503d5
Type fulltextMimetype application/pdf

By organisation
Civil and Architectural Engineering
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 415 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 2632 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf