Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Model for estimation of time and cost based on risk evaluation applied on tunnel projects
KTH, Superseded Departments, Civil and Architectural Engineering.
2002 (English)Doctoral thesis, monograph (Other scientific)
Place, publisher, year, edition, pages
Stockholm: Byggvetenskap , 2002. , xxiv, 222 p.
Series
Trita-JOB. PHD, 1003
Keyword [en]
estimation, tim, cost, risk, tunnel, MonteCarlo simulation
Identifiers
URN: urn:nbn:se:kth:diva-3360OAI: oai:DiVA.org:kth-3360DiVA: diva2:9152
Public defence
2002-06-06
Note
NR 20140805Available from: 2002-06-03 Created: 2002-06-03Bibliographically approved

Open Access in DiVA

fulltext(4064 kB)13087 downloads
File information
File name FULLTEXT01.pdfFile size 4064 kBChecksum MD5
c155a249c3bd94139708c23120358541b8b5298b25e76db82789852f2fbeb6b3dbb631c1
Type fulltextMimetype application/pdf

By organisation
Civil and Architectural Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 13087 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 1536 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf