Change search
ReferencesLink to record
Permanent link

Direct link
Model for estimation of time and cost based on risk evaluation applied on tunnel projects
KTH, Superseded Departments, Civil and Architectural Engineering.
2002 (English)Doctoral thesis, monograph (Other scientific)
Place, publisher, year, edition, pages
Stockholm: Byggvetenskap , 2002. , xxiv, 222 p.
Trita-JOB. PHD, 1003
Keyword [en]
estimation, tim, cost, risk, tunnel, MonteCarlo simulation
URN: urn:nbn:se:kth:diva-3360OAI: diva2:9152
Public defence
NR 20140805Available from: 2002-06-03 Created: 2002-06-03Bibliographically approved

Open Access in DiVA

fulltext(4064 kB)12520 downloads
File information
File name FULLTEXT01.pdfFile size 4064 kBChecksum SHA-1
Type fulltextMimetype application/pdf

By organisation
Civil and Architectural Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 12520 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 1498 hits
ReferencesLink to record
Permanent link

Direct link