Change search
Refine search result
1 - 1 of 1
CiteExportLink to result list
Permanent link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Rows per page
  • 5
  • 10
  • 20
  • 50
  • 100
  • 250
Sort
  • Standard (Relevance)
  • Author A-Ö
  • Author Ö-A
  • Title A-Ö
  • Title Ö-A
  • Publication type A-Ö
  • Publication type Ö-A
  • Issued (Oldest first)
  • Issued (Newest first)
  • Created (Oldest first)
  • Created (Newest first)
  • Last updated (Oldest first)
  • Last updated (Newest first)
  • Disputation date (earliest first)
  • Disputation date (latest first)
  • Standard (Relevance)
  • Author A-Ö
  • Author Ö-A
  • Title A-Ö
  • Title Ö-A
  • Publication type A-Ö
  • Publication type Ö-A
  • Issued (Oldest first)
  • Issued (Newest first)
  • Created (Oldest first)
  • Created (Newest first)
  • Last updated (Oldest first)
  • Last updated (Newest first)
  • Disputation date (earliest first)
  • Disputation date (latest first)
Select
The maximal number of hits you can export is 250. When you want to export more records please use the Create feeds function.
  • 1.
    Chakrabarti, Sambuddha
    et al.
    KTH, School of Electrical Engineering and Computer Science (EECS), Electric Power and Energy Systems.
    Hesamzadeh, Mohammad Reza
    KTH, School of Electrical Engineering and Computer Science (EECS), Electric Power and Energy Systems.
    Financial Transmission Rights: A New Proposal2018In: 2018 15TH INTERNATIONAL CONFERENCE ON THE EUROPEAN ENERGY MARKET (EEM), IEEE , 2018Conference paper (Refereed)
    Abstract [en]

    In this paper, we will consider the problems of Revenue Adequacy (RA) and Hedging to Risk (H2R), faced by the Independent System Operators (ISOs) and holders of Financial Transmission Rights (FTRs) (or, Congestion Revenue Rights, or CRRs as they are variously known), respectively. It is well known, that the main driver for these two problems is the difference in the topology of the network that is used while solving the FTR auction and allocation process, to that used in the Day Ahead (DA) or Real Time (RT) market dispatch calculations. As we will see in this paper, that the problems of RA and H2R form a set of conflicting requirements, especially when situations corresponding to changing network topologies are considered. We will, therefore, in the present work, propose a newer type of FTR such that both the above-mentioned problems are averted. We will also present the revised auction mechanism of this new FTR, in order to incentivize both the ISOs and the potential holders to sell and purchase them, respectively.

1 - 1 of 1
CiteExportLink to result list
Permanent link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf