kth.sePublications KTH
Operational message
There are currently operational disruptions. Troubleshooting is in progress.
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Detaljplaneprocessens dynamik: Kommuners organisatoriska arbete och lagförändringars genomslag
KTH, School of Architecture and the Built Environment (ABE), Real Estate and Construction Management.
KTH, School of Architecture and the Built Environment (ABE), Real Estate and Construction Management.
2025 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
The Dynamics of the Detailed Development Plan Process : Municipalities' Organizational Work and the Impact of Legislative Changes (English)
Abstract [sv]

Detaljplaneprocesser blir alltmer komplexa och präglas ofta av långa ledtider och samordningsutmaningar mellan olika aktörer. De senaste åren har flertalet lagförändringar genomförts i syfte att förenkla och effektivisera detaljplaneprocessen för kommuner, men har förändringarna gett effekt? Denna studie undersöker hur ett urval av Sveriges kommuner arbetar med detaljplaneprocessen i praktiken samt vilka aspekter som påverkar ledtider, både i positiv och negativ bemärkelse.

Studien bygger på kvalitativa intervjuer med representanter från sju kommuner i Sverige av varierande storlek. Genom dessa intervjuer kartläggs både gemensamma framgångsfaktorer och utmaningar i kommunernas arbete. Resultat visar att kommunerna till stor del har liknande struktur i organisationen, antal medarbetare och kompetens. Det som däremot särskiljer många kommuner åt är om, och i vilken omfattning de använder sig av olika verktyg för en effektiv detaljplaneprocess. Utmaningar för kommunerna som identifierats är bland annat utredningar och samverkan med intressenter. Framgångsfaktorer som framkommit i undersökningen är bland annat användning av extern kompetens i detaljplaneprocessen, delegation av beslut från politiken och en kontinuerligt uppdaterad och förankrad översiktsplan.

Studien belyser även ett antal lagförändringar som genomförts i Plan- och bygglagen (2010:900) under det senaste decenniet. Även om dessa lagförändringar har syftat till att effektivisera detaljplaneprocessen, upplever många kommuner att de inte har haft någon påtaglig effekt. Vissa kommuner uppger att man redan arbetar enligt de förändringar som kommer, medan andra menar att förändringarna har inneburit negativ effekt på detaljplanearbetet.

I slutsatsen kommer vi fram till att det finns olika åtgärder kommuner kan vidta för att effektivisera detaljplaneprocessen. Antalet utredningar är den största utmaningen för kommunerna i detaljplaneprocessen och uppges vara det som tar mest tid. Det är därför kritiskt att de lagförändringar som genomförs motverkar de faktiska problemen och gör på rätt sätt. 

Abstract [en]

Detailed development planning in Sweden is becoming increasingly complex and is often characterized by long lead times and coordination challenges between various stakeholders. In recent years, several legislative changes have been implemented with the aim of simplifying and streamlining the municipal planning process. But have these reforms yielded the intended effects?

This study investigates how a selection of Swedish municipalities manages the detailed development planning process in practice, and identifies key factors that influence processing times, both positively and negatively. The study is based on qualitative interviews with representatives from seven municipalities of varying sizes. The result reveal that while municipal planning organizations are largely similar in terms of structure, staffing, and competence, there are clear differences in how and to what extent municipalities apply specific tools to increase efficiency.

Identified challenges include the extent and scope of required investigations, as well as the coordination with external stakeholders. Success factors, on the other hand, include the use of external expertise, delegation of decisions from political bodies, and having a continuously updated and well-anchoredcomprehensive plan. 

The study also discusses recent amendments to the Plan- och bygglagen (2010:900) Although these reforms aimed to streamline the planning process, many municipalities report limited or no tangible impact. Some note that their working methods already aligned with the changes, while others argue that the reforms have complicated rather than facilitated planning efforts.

The conclusion highlights actionable strategies that municipalities can implement to improve efficiency. Among all factors, the scope of investigations stands out as the primary bottleneck, consuming the most time. It is therefore crucial that future legislative reforms directly address these core issues in a targeted and effective manner.

Place, publisher, year, edition, pages
2025. , p. 74
Series
TRITA-ABE-MBT ; 25189
Keywords [en]
Municipal, detailed development plan, detailed planning, investigations, Planning and Building Act, Nationellt ledtidsindex
Keywords [sv]
Kommun, detaljplan, utredningar, Plan- och bygglagen, Nationellt ledtidsindex
National Category
Civil Engineering
Identifiers
URN: urn:nbn:se:kth:diva-364375OAI: oai:DiVA.org:kth-364375DiVA, id: diva2:1967783
Subject / course
Land Management
Educational program
Bachelor of Science - Property Development and Agency
Supervisors
Examiners
Available from: 2025-06-12 Created: 2025-06-12 Last updated: 2025-06-12Bibliographically approved

Open Access in DiVA

fulltext(2157 kB)54 downloads
File information
File name FULLTEXT01.pdfFile size 2157 kBChecksum SHA-512
08a824e74918508116282cd960301f86197569cfd5c5eb713f916db176f260fedd27c32bf38066484b7e67c38f9162cca22a91b03ff08f6debab60b9313f3be4
Type fulltextMimetype application/pdf

By organisation
Real Estate and Construction Management
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 54 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 281 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf