kth.sePublications KTH
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Jämförelse mellan teoretisk och faktisk värdeflödeskartläggning (VSM)
KTH, School of Industrial Engineering and Management (ITM), Production engineering.
KTH, School of Industrial Engineering and Management (ITM), Production engineering.
2025 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
Comparison between Theoretical and Actual Value Stream Mapping (VSM) (English)
Abstract [sv]

Detta examensarbete analyserar skillnader mellan planerade och faktiska produktionsflöden i ett tillverkande företag ”TurnMillGroup”. Med hjälp av Lean Produktion, 7+1 slöserier och Value Stream Mapping (VSM) undersöks två artikelbaserade flöden. Studien bygger på data från Monitor ERP där planerade tider jämförs med faktisk rapportering. Resultaten visar avvikelser i form av kötider, utebliven ställtid och leveransförseningar. Analysen kopplar dessa till olika typer av slöseri enligt Lean-principer. Arbetet avslutas med förbättringsförslag för att minska genomloppstider och använda resurser bättre.

Abstract [en]

This thesis analyzes the differences between planned and actual production flows in a manufacturing company, "TurnMill Group". Using Lean Production, the 7+1 types of waste, and Value Stream Mapping (VSM), two article-based flows are examined. The study is based on data from the Monitor ERP system, where scheduled times are compared with actual production reporting. The results reveal deviations such as queue times, unreported setup activities, and delivery delays. The analysis links these findings to different types of waste according to Lean principles. The thesis concludes with improvement suggestions aimed at reducing lead times and improving resource utilization.

Place, publisher, year, edition, pages
2025. , p. 43
Series
TRITA-ITM-EX ; 2025:255
Keywords [en]
Value Stream Mapping (VSM), Lean Production, 7+1 types of waste, Lead time, Production flow, Monitor ERP, Current state map.
Keywords [sv]
Value Stream Mapping (VSM), Lean Production, 7+1 slöserier, Genomloppstid, Produktionsflöde, Monitor ERP, Nulägeskarta.
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:kth:diva-366488OAI: oai:DiVA.org:kth-366488DiVA, id: diva2:1982499
External cooperation
TurnMill Group
Educational program
Bachelor of Science in Engineering - Mechanical Engineering
Supervisors
Examiners
Available from: 2025-07-08 Created: 2025-07-08

Open Access in DiVA

fulltext(1220 kB)187 downloads
File information
File name FULLTEXT01.pdfFile size 1220 kBChecksum SHA-512
46bf118659506fd22cc04fe20efb5414eec2077f5a3fccea0c0a790cf867098f598a82c6b78e6a6097309694c0b22a7038686d99ff85aea0d720810064bbbcb2
Type fulltextMimetype application/pdf

By organisation
Production engineering
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 190 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 268 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf