kth.sePublications KTH
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Prefabtransporter och miljöeffekter: Logistik och miljöpåverkan vid transport av prefabricerade byggdelar i byggprojekt
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Building Technology and Design.
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Building Technology and Design.
2026 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Prefab Transporters and Environmental Impacts : Logistics and environmental impact of transporting prefabricated building components in construction projects (English)
Abstract [sv]

Detta examensarbete handlar om hur transport och logistik fungerar i byggprojekt somanvänder prefabricerade byggdelar samt hur dessa transporter påverkar både byggprocessenoch omgivningen. Prefabricerat byggnad har blivit allt vanligare inom byggbranscheneftersom det kan göra byggandet snabbare, mer strukturerat och effektivt. Samtidigt innebärarbetssättet att stora delar måste transporteras till byggarbetsplatsen vid rätt tidpunkt vilketställer höga krav på planering och samordning. Prefabricerat byggande har blivit allt vanligareeftersom det gör byggprocessen snabbare och mer kontrollerad. När byggdelar tillverkas ifabrik minskar påverkan av väder och montaget på byggarbetsplatsen går fortare.Syftet med studien har varit att identifiera vilka problem som kan uppstå vid transport avprefabricerade byggdelar och hur logistiken kan förbättras. Studien bygger på intervjuer medpersoner som har erfarenhet av Prefab projekt samt en enkätundersökning genomförd på enbyggarbetsplats där prefabricerade byggdelar används.Resultat visar att logistiken har stor betydelse för hur smidigt projekt genomförs. Närleveranserna fungerar som planerat upplevs arbetet som effektivt och mindre stressande.Studien visar också att Just In Time leveranser är vanliga förekommande i prefabriceradeprojekt. Det innebär att byggdelar levereras direkt till montage utan mellanlagring. Dettaarbetssätt kan vara mer effektivt. För att detta ska fungera krävs tydlig kommunikation mellanfabrik, transportör och byggarbetsplats samt god framförhållning i planeringen. När det gäller effektivisering visar intervjuerna samt enkätundersökningen att bättre planeringav leveranstider, tydligare ansvarsfördelning och förbättrad kommunikation mellan aktörer ärde viktigaste åtgärderna. Transporter av prefabricerade byggdelar påverkar miljön och trafikeni närområdet. Tunga transport kan bidra till ökad trafik, buller och tillfälliga avstängningarsärskild i stadsmiljöer. Samtidigt visar studien att prefabricerad byggande kan ge positivamiljöeffekter genom minskat materialspill och färre transporter.Sammanfattningsvis visar studien att prefabricerade byggdelar kan bidra till en snabbare ochmer kontrollerade byggprocess men att framgången är starkt beroende av hur logistikenhanteras. Tydlig planering, väl fungerande leveranssätt och god samverkan mellan deinblandade aktörer är avgörande för att prefabricerat byggande ska fungera effektivt, säkertoch med så liten påverkan på omgivningen som möjligt.

Abstract [en]

This bachelor’s thesis examines how transport and logistics function in construction projectsthat use prefabricated building components, as well as how these transports affect both theconstruction process and the surrounding environment. Prefabricated construction has becomeincreasingly common in the construction industry, as it can make building projects faster,more structured, and more efficient. At the same time, this approach requires large buildingcomponents to be delivered to the construction site at the right time, which places highdemands on planning and coordination. When building components are manufactured infactories, the impact of weather is reduced, and on-site assembly can be carried out morequickly and in a more controlled manner.The aim of the study has been to identify the problems that may arise during the transport ofprefabricated building components and to examine how logistics can be improved. The studyis based on interviews with professionals who have experience working in prefabricatedconstruction projects, as well as a questionnaire survey conducted at a construction site whereprefabricated building components are used.The results show that logistics play a significant role in how smooth construction projects arecarried out. When deliveries are made according to plan, the work process is perceived asmore efficient and less stressful. The study also shows that Just-in-Time deliveries arecommonly used in prefabricated construction projects. This means that building componentsare delivered directly to the assembly process without intermediate storage. While thisapproach can increase efficiency, it requires clear communication between the factory, thetransport provider, and the construction site, as well as careful and proactive planning.Regarding efficiency improvements, both the interviews and the survey results indicate thatbetter planning of delivery schedules, clearer allocation of responsibilities, and improvedcommunication between stakeholders are among the most important measures. The transportof prefabricated building components also affects the surrounding environment and localtraffic. Heavy transport can contribute to increased traffic, noise, and temporary road closures,particularly in urban areas. At the same time, the study shows that prefabricated constructioncan have positive environmental effects through reduced material waste and less overalltransport.In conclusion, the study shows that prefabricated building components can contribute to afaster and more controlled construction process, but that success is strongly dependent on howwell logistics are managed. Clear planning, well-functioning delivery methods, and goodcollaboration between the stakeholders involved are crucial for prefabricated construction tobe carried out efficiently, safely, and with minimal impact on the surrounding environment.

Place, publisher, year, edition, pages
2026.
Series
TRITA-ABE-MBT ; 2622
Keywords [en]
Prefab, logistics, construction logistics, challenges, efficiency, Just-in-time, Supply Chain Management, third-party logistics and work environment.
Keywords [sv]
Prefab, logistik, bygglogistik, utmaningar, effektivisering, Just-in-time, Supply Chain Management, tredjepartslogistik och arbetsmiljö.
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:kth:diva-377023OAI: oai:DiVA.org:kth-377023DiVA, id: diva2:2040388
External cooperation
K-Prefab AB, Prefabsystem AB, JM AB, Lindbäcks Bygg AB, Gunnar Prefab AB
Supervisors
Examiners
Available from: 2026-02-20 Created: 2026-02-20

Open Access in DiVA

fulltext(1021 kB)98 downloads
File information
File name FULLTEXT01.pdfFile size 1021 kBChecksum SHA-512
cab64cccdf705dca535377fab372e1a7963969c1733e03b1d86e899239a67e337b019bc343ce073624bca4d94995f7490b0464f7ea4f4823ded5b500eeb49efd
Type fulltextMimetype application/pdf

By organisation
Building Technology and Design
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 7486 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf