kth.sePublications KTH
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Deliverable D6.1 Report on the description of algorithms for long-term timetabling, short-term timetabling and rolling stock planning
SINTEF.ORCID iD: 0000-0003-2974-9165
SINTEF.ORCID iD: 0000-0001-6161-0556
SINTEF.ORCID iD: 0000-0002-3444-6209
Show others and affiliations
2024 (English)Report (Other academic)
Abstract [en]

This deliverable describes the main developments carried out in WP6, with focus on models and algorithms to improve long-term and short-term timetabling of the railway network. The activities in WP6 aim at increasing infrastructure and transport utilisation capacity through optimised and robust timetables, synchronized with rolling stock planning. These objectives have been targeted through

a. The development of advanced algorithms for the generation and adjustment of timetables and rolling stock planning, which will be further developed and completed in WP7

b. The definition a suitable family of use cases, which will be demonstrated in WP7

c. The implementation of specific technical enablers.

Addressed technical enabler and the defined use cases and demonstrators are synthetically reported in the background Section 3 of this document.

All the timetabling and rolling stock planning problems tackled in WP6 require to find good quality solutions fulfilling various physical and logical requirements, and the business rules of the railway infrastructure managers and railway undertakings. As such, they can be viewed as optimization problems, which can be modelled and solved by means of mathematical optimization, an AI discipline which concerns the making of optimal decisions. With few exceptions, the models developed in WP6 are based on Mixed Integer Linear Programming or Constraint Programming, solved then by means of specialized commercial solvers (as CPLEX, or GUROBI), or by ad-hoc heuristic algorithms, such as local search, genetic algorithms, simulated annealing. Mathematical decomposition and graph theory are also exploited to model and solve various problems.

Although the algorithms developed in WP6 are not yet fully completed – they will be in the first year of WP7 – still some interesting and promising conclusions can be drawn. In fact, tests on realistic instances have been performed. It turns out that the developed methods work well for the size and the type of instances for which they are designed. In turn, this implies that we can expect they will tackle the instances arising in the demonstrations of the planned use-cases. Ultimately, this means that in general the approaches will be able to support human planners in their activities, and to automatize segments of the current planning process. Preliminary results show that solutions of high quality can be produced in short computing time. One limit is that, since the algorithms will be completed and demonstrated in WP7, these conclusions are still very preliminary. Also, the solution of full integrated problems appears to be still out of reach, and we need to content ourselves with tackling suitable subproblems. For instance, we can possibly compute an optimal or quasi-optimal timetable for the entire Norwegian network, and subsequently calculate an associated optimal rolling stock rotation, and solve the stabling problem, but we are still far from being able to solve to optimality the three problems jointly. 

Place, publisher, year, edition, pages
2024. , p. 257
National Category
Transport Systems and Logistics
Research subject
Transport Science, Transport Systems; Järnvägsgruppen - Effektiva tågsystem för persontrafik; Järnvägsgruppen - Effektiva tågsystem för godstrafik
Identifiers
URN: urn:nbn:se:kth:diva-379308OAI: oai:DiVA.org:kth-379308DiVA, id: diva2:2053393
Projects
MOTIONAL WP6
Funder
EU, Horizon 2020, 101101973
Note

QC 20260416

Available from: 2026-04-16 Created: 2026-04-16 Last updated: 2026-04-16Bibliographically approved

Open Access in DiVA

fulltext(7301 kB)375 downloads
File information
File name FULLTEXT01.pdfFile size 7301 kBChecksum SHA-512
815f25cdc2c19f94dd548ff2f2f90bcae8549f9b66b8a55b5c02e288606ca84565900aaeabb6e0f110d126bd31e16b7e3c03bdc44dcf0633602454bfe1a17a52
Type fulltextMimetype application/pdf

Authority records

Johansson, Ingrid

Search in DiVA

By author/editor
Mannino, CarloHuisman, DennisSartor, GiorgioLuteberget, BjørnarMaróti, GáborSolinen, EmmaGestrelius, SaraHäll, Carl HenrikFredriksson, MikaelJohansson, IngridWidmann, PhilippBrinkmann, FlorianAbsi, NabilDauzère-Pérès, StéphaneTerfasse, KarimLu, Yahan
By organisation
Transport planningThe KTH Railway Group
Transport Systems and Logistics

Search outside of DiVA

GoogleGoogle Scholar
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 3845 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf