Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Assessment of Wind Power Variability in Ethiopian Power System
Addis Ababa Univ, Addis Ababa Inst Technol, Addis Ababa, Ethiopia..
Addis Ababa Univ, Addis Ababa Inst Technol, Addis Ababa, Ethiopia..
KTH, Skolan för elektroteknik och datavetenskap (EECS), Elektroteknik, Elkraftteknik.ORCID-id: 0000-0002-8189-2420
2021 (engelsk)Inngår i: 2021 IEEE PES/IAS Powerafrica Conference, Institute of Electrical and Electronics Engineers (IEEE) , 2021, s. 539-543Konferansepaper, Publicerat paper (Fagfellevurdert)
Abstract [en]

Due to the intermittent and variable nature of wind, grid integration of wind power is a big challenge in power system operation. Studies that evaluate and identify the impact of wind power on power system operation and mitigation techniques is indispensable. This paper has evaluated the hourly variability of hourly wind power production in Ethiopian wind farms. The evaluation has identified the maximum up and down variation of the production. The duration that the hourly step change is greater than 5% and less than -5% to see the duration of calm time also studied. The result show that the extreme maximum up and down hourly wind power production variation is observed in Adama I which is 100% of rated capacity. This is because of the small installed capacity compared to the aggregated production which has the maximum up and down hourly wind power production of 53.40% and -65.7% respectively and this shows that wind power production in Ethiopia is highly ramping up and down. From the simulation result it was clearly observed that the correlation between wind farms is reduced as the distance between them increases. Not only this but also the paper has also shown that the probability of low production is observed during autumn season and probability of high production is observed during spring and winter season.This challenge increases if the penetration level of wind increases. Thus, the authors recommend that before grid integration of wind power, it is necessary to evaluate its impact on grid operation.

sted, utgiver, år, opplag, sider
Institute of Electrical and Electronics Engineers (IEEE) , 2021. s. 539-543
Emneord [en]
Variability, Evaluation, Wind, Power
HSV kategori
Identifikatorer
URN: urn:nbn:se:kth:diva-306543DOI: 10.1109/POWERAFRICA52236.2021.9543094ISI: 000724682300110Scopus ID: 2-s2.0-85116709877OAI: oai:DiVA.org:kth-306543DiVA, id: diva2:1622700
Konferanse
IEEE PES/IAS PowerAfrica Conference, AUG 23-27, 2021, ELECTR NETWORK
Merknad

QC 20211223

Part of proceedings: ISBN 978-1-6654-0311-5

Tilgjengelig fra: 2021-12-23 Laget: 2021-12-23 Sist oppdatert: 2023-01-18bibliografisk kontrollert

Open Access i DiVA

Fulltekst mangler i DiVA

Andre lenker

Forlagets fulltekstScopus

Person

Söder, Lennart

Søk i DiVA

Av forfatter/redaktør
Söder, Lennart
Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric

doi
urn-nbn
Totalt: 85 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf