Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Techno-Economic Assessment of Municipal Solid Waste (MSW) Incineration in Ghana
Univ Mines & Technol UMaT, Dept Mech Engn, POB 237, Tarkwa, Ghana.
Univ Mines & Technol UMaT, Dept Mech Engn, POB 237, Tarkwa, Ghana.
Univ Mines & Technol UMaT, Dept Mech Engn, POB 237, Tarkwa, Ghana.
Univ Mines & Technol UMaT, Dept Mech Engn, POB 237, Tarkwa, Ghana.
Vise andre og tillknytning
2024 (engelsk)Inngår i: Processes, E-ISSN 2227-9717, Vol. 12, nr 7, artikkel-id 1286Artikkel i tidsskrift (Fagfellevurdert) Published
Abstract [en]

Waste incineration with energy recovery is a matured Waste-to-Energy (WtE) technology which has contributed immensely to the disposal and management of Municipal Solid Waste (MSW) in industrialised nations. The adoption of this technology in developing countries is currently gaining momentum due to the numerous benefits that can be derived from its use. In this study, a techno-economic assessment of MSW incineration in proposed waste incineration facilities for use in Ghana was carried out. The technical assessment was conducted by determining the plant capacity and annual electricity production based on the combustible residues of MSW collected from various population sizes in the country, while the economic assessment was carried out by determining two key economic indicators, Net Present Value (NPV) and Levelised Cost of Energy (LCOE). It was found that a total of about 400 MW of electricity can be generated from the total of about 14,000 tonnes of MSW generated in the country daily. The NPV for a 35.81 MW installed capacity of waste incineration facility was found to be USD 166,410,969.24. However, the LCOE for the 35.81 MW capacity and all others considered was greater than the tariff of electricity for their respective capacities, which means waste incineration facilities are not economically viable ventures in Ghana. The implementation of these facilities in the country would, therefore, need governmental support in the form of subsidies and tax rebates. Three locations were proposed for the piloting of waste incineration facilities in the country, and these locations are in the Accra Metropolitan, Asokore-Mampong Metropolitan, and Sekondi-Takoradi Metropolitan Assemblies.

sted, utgiver, år, opplag, sider
MDPI AG , 2024. Vol. 12, nr 7, artikkel-id 1286
Emneord [en]
waste incineration, energy recovery, waste-to-energy, municipal solid waste, net present value, levelised cost of energy
HSV kategori
Identifikatorer
URN: urn:nbn:se:kth:diva-351426DOI: 10.3390/pr12071286ISI: 001276993100001Scopus ID: 2-s2.0-85199862720OAI: oai:DiVA.org:kth-351426DiVA, id: diva2:1889434
Forskningsfinansiär
StandUp
Merknad

QC 20240815

Tilgjengelig fra: 2024-08-15 Laget: 2024-08-15 Sist oppdatert: 2026-03-10bibliografisk kontrollert

Open Access i DiVA

Fulltekst mangler i DiVA

Andre lenker

Forlagets fulltekstScopus

Person

Martin, Andrew R.

Søk i DiVA

Av forfatter/redaktør
Martin, Andrew R.
Av organisasjonen
I samme tidsskrift
Processes

Søk utenfor DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric

doi
urn-nbn
Totalt: 160 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf