kth.sePublikationer KTH
Ändra sökning
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Automation and synchronisation on electro-hydraulic lifting system of tunnel boring machine segment assembly
State Key Laboratory of Fluid Power Components and Mechatronic Systems, Zhejiang University, 310027 Hangzhou, China.
State Key Laboratory of Fluid Power Components and Mechatronic Systems, Zhejiang University, 310027 Hangzhou, China.
State Key Laboratory of Fluid Power Components and Mechatronic Systems, Zhejiang University, 310027 Hangzhou, China.
KTH, Skolan för industriell teknik och management (ITM), Energiteknik, Kraft- och värmeteknologi.ORCID-id: 0000-0003-4134-3520
Visa övriga samt affilieringar
2025 (Engelska)Ingår i: International Journal of Hydromechatronics, ISSN 2515-0464, Vol. 8, nr 1, s. 94-120Artikel i tidskrift (Refereegranskat) Published
Abstract [en]

Segment lifting, performed by an electro-hydraulic system including two cylinders, is a crucial step in segment grasping, transporting, and assembly in tunnel boring machines. Due to heavy and uneven loading, large vibration, uncertainty of parameters, and nonlinear friction, it is difficult to develop an accurate physical model. This paper presents a comprehensive procedure to achieve two-cylinder automation and synchronisation according to the actual engineering requirements and environments. An improved deviation compensation recursive least squares identification algorithm with a forgetting factor was used to identify the key parameters of the model. To achieve synchronous control and precise control of the lifting system, SMC with improved sliding mode approach rate and the deviation coupling method of fusion single neuron PID were designed and verified by simulation. A full-scale bench test was also performed to show that the tracking steady-state error is below 4 mm, and the synchronisation error is below 2 mm.

Ort, förlag, år, upplaga, sidor
Inderscience Publishers , 2025. Vol. 8, nr 1, s. 94-120
Nyckelord [en]
automation, parameter identification, segment assembly, synchronous control, tunnel boring
Nationell ämneskategori
Geologi Farkost och rymdteknik
Identifikatorer
URN: urn:nbn:se:kth:diva-361782DOI: 10.1504/IJHM.2025.144951Scopus ID: 2-s2.0-86000757815OAI: oai:DiVA.org:kth-361782DiVA, id: diva2:1948049
Anmärkning

QC 20250331

Tillgänglig från: 2025-03-27 Skapad: 2025-03-27 Senast uppdaterad: 2025-03-31Bibliografiskt granskad

Open Access i DiVA

Fulltext saknas i DiVA

Övriga länkar

Förlagets fulltextScopus

Person

Wang, Wujun

Sök vidare i DiVA

Av författaren/redaktören
Wang, Wujun
Av organisationen
Kraft- och värmeteknologi
GeologiFarkost och rymdteknik

Sök vidare utanför DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetricpoäng

doi
urn-nbn
Totalt: 128 träffar
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf