kth.sePublications KTH
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Bootstrapped artificial neural network model for uncertainty analysis in MELCOR simulation of severe accident
KTH, School of Engineering Sciences (SCI), Physics, Nuclear Power Safety.ORCID iD: 0000-0001-5778-6778
KTH, School of Engineering Sciences (SCI), Physics, Nuclear Power Safety.ORCID iD: 0000-0002-8917-7720
2023 (English)In: Progress in nuclear energy (New series), ISSN 0149-1970, E-ISSN 1878-4224, Vol. 157, article id 104556Article in journal (Refereed) Published
Abstract [en]

This study is concerned with uncertainty analysis of MELCOR simulation of a hypothetical severe accident initiated by station blackout (SBO) in a Nordic boiling water reactor (BWR). The hydrogen mass from cladding oxidation and the vessel failure timing in the accident are selected as the figures of merit (FOMs) in this study. As a conventional approach of uncertainty analysis, 456 cases with random sampling of 31 MELCOR input pa-rameters are executed by the code to produce the empirical cumulative distribution functions (CDFs) and the empirical 95th percentiles of the FOMs. Given the sufficient sample cases, uncertainty analyses through two nonparametric methods at various orders, i.e., the Wilks' method and the Wald & Guba's method, can then be performed to obtain the distributions of 95/95 estimates (95th percentiles estimated at a 95% confidence level) of single FOM and two FOMs. However, the conventional approach turns out to be time consuming and computationally expensive since many sample cases require iterative tuning of MELCOR input to restart and finish calculations. To overcome this issue encountered in the conventional approach of uncertainty analysis, an alternative approach is developed in the present study, in which 150 and 170 MELCOR calculation cases are used to develop bootstrapped artificial neural network (ANN) models which predict single FOM and two FOMs, respectively. The bootstrapped ANN models are then employed in uncertainty analyses through the two nonparametric methods of 95/95 estimates mentioned above. The comparative results show that the alternative approach can reproduce the distributions of 95/95 estimates for both single FOM and two FOMs with less computational costs. Moreover, while the Wilks' method or the Wald & Guba's method at a very high order (e.g., 100th order) can be used in the alternative approach to produce 95/95 estimates closer to the empirical 95th percentile, it is practically impossible to do so in the conventional approach due to unaffordable computational cost of excessive MELCOR runs. Hence, it can be concluded that the alternative approach of uncertainty analysis is not only effective (much less MELCOR cases with least fixing of unsuccessful runs), but also enabling high -order nonparametric methods for 95/95 estimates.

Place, publisher, year, edition, pages
Elsevier BV , 2023. Vol. 157, article id 104556
Keywords [en]
Severe accident, MELCOR, Best estimate plus uncertainty analysis, Nonparametric method, Bootstrapped ANN model
National Category
Probability Theory and Statistics
Identifiers
URN: urn:nbn:se:kth:diva-324531DOI: 10.1016/j.pnucene.2022.104556ISI: 000926196700001Scopus ID: 2-s2.0-85145771421OAI: oai:DiVA.org:kth-324531DiVA, id: diva2:1741761
Note

QC 20230307

Available from: 2023-03-07 Created: 2023-03-07 Last updated: 2024-03-26Bibliographically approved
In thesis
1. Development and Application of Uncertainty Analysis Approaches for MELCOR Simulations of Severe Accidents
Open this publication in new window or tab >>Development and Application of Uncertainty Analysis Approaches for MELCOR Simulations of Severe Accidents
2024 (English)Doctoral thesis, comprehensive summary (Other academic)
Abstract [en]

The contemporary needs in advancing safety analysis methods and the increasing stringency in light water reactor (LWR) safety in the post-Fukushima era require more advanced and systematical approaches for severe accident analyses. The best estimate plus uncertainty (BEPU) methods are among such approaches and have been widely used for deterministic safety analysis (DSA) of design basis accidents (DBAs). However, the BEPU analyses of severe accidents (SAs) are not straightforward due to the complexity of SA phenomena and the specialties of SA simulation tools. It is therefore necessary to develop BEPU approaches for severe accidents.  

This thesis work starts from an application of the conventional BEPU approach using various uncertainty quantification (UQ) methods of 95/95 tolerance limits to MELCOR simulations of severe accidents, with the aim to identify their capabilities in MELCOR simulations of severe accidents. Both parametric and nonparametric UQ methods, including goodness-of-fit test, Wilks’ methods, Baren and Hall’s linear interpolation and Hutson fractional statistics, are applied to postulated severe accident scenarios in a Nordic boiling water reactor (BWR). It is found that (i) a small sample size or a low order in these UQ methods tends to cause conservative estimates, and (ii) a large sample size has many unsuccessful MELCOR calculation cases and fixing of the cases incurs an explosive computational cost. To solve this problem, two alternative approaches are supposed to be developed in the next step.

The first alternative approach is to develop a bootstrapped artificial neural network (ANN) model to be employed in UQ; and the second alternative approach is to couple deterministic sampling (DS) methods with a fixed/dynamic coverage factor. The first alternative approach overcomes the problem in the conventional BEPU approach, i.e. the explosive computation cost due to fixing many crashed MELCOR cases otherwise it ruins randomness of samples. The idea behind this approach is to use surrogate models (SMs) developed from successful MELCOR calculations to predict the relation between major uncertain inputs and outputs. As a result, an UQ with numerically equivalent estimate of 95/95 tolerance limits can be done. The approach is applied to a severe accident scenario due to station blackout (SBO) in a Nordic BWR and results are compared with those of the conventional approach. The second approach is proposed for realistic estimates with reduced computational costs. Its theoretical basis is that DS methods can use far fewer samples to produce approximately convergent estimates of the statistical moments of outputs (figures of merits). By introducing a fixed or dynamic coverage factor, the information on the first two statistical moments can be extended to 95th percentiles or so-called numerically equivalent estimates of 95/95 tolerance limits. The second approach is applied to a severe accident scenario of SBO in a Swedish PWR and compared with the conventional approach.

The comparative results show that the two alternative approaches work well in uncertainty quantification of MELCOR simulations of the postulated severe accident scenarios chosen. For instance, given the mass of H2 production and the timing of vessel failure as the figures of merit (FOMs), the first alternative approach predicts the 95/95 estimates similar to those of the conventional approach. Besides, a high order nonparametric method can be used in the bootstrapped ANN model for stable and realistic estimates, which is almost impossible for the conventional approach due to the requirement of numerous MELCOR calculations. For the second approach, a fixed coverage factor 1.65 should be used when the outputs (figures of merits) are symmetrically distributed like normal distribution. Otherwise, a dynamic coverage factor from a fitted beta distribution should be used to avoid unrealistic estimates when the outputs are strongly skewed. It is thus concluded that the two proposed alternative approaches have potentials to replace the conventional approach of uncertainty quantification for MELCOR simulations of severe accidents, in case of too high computational cost due to a large sample size or many unsuccessful MELCOR calculations incurred in the conventional approach.

Abstract [sv]

Rådande behov av att utveckla säkerhetsanalysmetoder och den ökande stringensen i lättvattenreaktorsäkerhet (LWR) efter Fukushima kräver mer avancerade och systematiska tillvägagångssätt för att analysera svåra haverier. Metoderna för bästa skattning plus osäkerhet (BEPU) är ett sådant tillvägagångssätt och har använts brett för deterministiska säkerhetsanalyser (DSA) av konstruktionsstyrande haverier (DBA). Däremot är BEPU-analys av svåra haverier (SA) mer komplicerat på grund av SA-fenomens komplexitet och SA-simuleringsverktygens specialiteter. BEPU-metoder för svåra haverier behöver därför utvecklas.

Denna doktorsavhandling utgår från den konventionella BEPU-metoden där olika metoder för att bestämma osäkerheter (UQ) med 95/95 toleransgränser används i MELCOR-simuleringar av svåra haverier i syfte att fastställa deras tillämplighet. Både parametriska och icke-parametriska UQ-metoder, inklusive goodness-of-fit-test, Wilks-metoder, Baren och Halls linjära interpolering och metoder utvecklade av Hutson, tillämpas på postulerade scenarier med svåra haverier i en nordisk kokvattenreaktor (BWR). Det har visat sig att (i) en liten urvalsstorlek eller en låg ordning i dessa UQ-metoder tenderar att ge konservativa uppskattningar, och (ii) en stor urvalsstorlek medför många misslyckade beräkningsfall med MELCOR och att åtgärda fallen medför en explosionsartad beräkningskostnad. För att lösa detta problem föreslås två alternativa ansatser som kan utvecklas vidare i ett senare steg.

Den första alternativa ansatsen är att utveckla en modell med artificiellt neuronnät (ANN) baserad på ”bootstrapping” som ska användas i UQ; och den andra alternativa ansatsen är att koppla deterministiska urvalsmetoder (DS) med en fast/dynamisk täckningsfaktor. Det första alternativa tillvägagångssättet löser problemet med den konventionella BEPU-metoden, d.v.s. den explosionsartade beräkningskostnaden till följd av att åtgärda många kraschade MELCOR-fall som annars förstör det slumpmässiga urvalet. Tanken bakom ansatsen är att använda surrogatmodeller (SM) baserade på framgångsrika MELCOR-beräkningar för att förutspå sambandet mellan osäkra in- och utdata. Som ett resultat kan en UQ med numeriskt ekvivalent uppskattning med 95/95-toleransgräns göras. Ansatsen tillämpas för ett scenario med svårt haveri på grund av totalt elbortfall (SBO) i en nordisk BWR och resultaten jämförs med resultat som baserats på konventionella metoder. Den andra metoden föreslås användas för realistiska uppskattningar till lägre beräkningskostnader. Dess teoretiska grund är att DS-metoder behöver färre stickprov för att ge ungefärliga konvergenta uppskattningar av de statistiska momenten för utdata. Genom att införa en fast eller dynamisk täckningsfaktor kan informationen om de två första statistiska momenten utökas till 95:e percentil, eller så kallade numeriskt ekvivalenta uppskattningar av 95/95-toleransgränser. Det andra tillvägagångssättet tillämpas för ett svårt haveri av SBO i en svensk PWR och jämförs med resultat som baserats på konventionella metoder.

Resultatjämförelsen visar att de två alternativa tillvägagångssätten lämpar sig väl för att bestämma osäkerheter i MELCOR-simuleringar av de valda scenarierna med svåra haverier.  Exempelvis förutspår den första alternativa metoden, vid beräkning av H2-massa och tidpunkten för tankgenombrott, 95/95-uppskattningar som liknar de som är genomförda med konventionella metoder. Dessutom kan en icke-parametrisk metod av hög ordning användas i ANN-modellen för stabila och realistiska uppskattningar, vilket är nästan omöjligt för den konventionella metoden på grund av kravet på många MELCOR-beräkningar. För det andra tillvägagångssättet bör en fast täckningsfaktor på 1,65 användas när utdata är symmetriskt normalfördelade. I annat fall bör en dynamisk täckningsfaktor från en anpassad betadistribution användas för att undvika orealistiska uppskattningar när utdatafördelningen är kraftigt skev. Således dras slutsatsen att de två föreslagna alternativa tillvägagångssätten har potential att ersätta den konventionella metoden för bestämning av osäkerheter för MELCOR-simuleringar av svåra haverier vid höga beräkningskostnader på grund av en stor urvalsstorlek eller vid många misslyckade MELCOR-beräkningar genomförda med konventionella metoder.

Place, publisher, year, edition, pages
Stockholm: KTH Royal Institute of Technology, 2024. p. 70
Series
TRITA-SCI-FOU ; 2024:18
Keywords
Severe accident, MELCOR, uncertainty analysis, Wilks’ method, Bootstrapped artificial neural network, deterministic sampling method, 95/95 tolerance limit., Svåra haverier, MELCOR, osäkerhetsanalys, Wilks’ metod, artificiella neuronnät, deterministiska urvalsmetoder, 95/95-toleransgränser.
National Category
Energy Engineering
Identifiers
urn:nbn:se:kth:diva-344664 (URN)978-91-8040-881-3 (ISBN)
Public defence
2024-04-24, FA32, Albanova University Center, Roslagstullsbacken 21, Stockholm, 09:30 (English)
Opponent
Supervisors
Note

QC 2024-03-25

Available from: 2024-03-25 Created: 2024-03-25 Last updated: 2024-07-02Bibliographically approved

Open Access in DiVA

No full text in DiVA

Other links

Publisher's full textScopus

Authority records

Wang, WanhongMa, Weimin

Search in DiVA

By author/editor
Wang, WanhongMa, Weimin
By organisation
Nuclear Power Safety
In the same journal
Progress in nuclear energy (New series)
Probability Theory and Statistics

Search outside of DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 127 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf