kth.sePublications KTH
Operational message
There are currently operational disruptions. Troubleshooting is in progress.
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Analys av ställ- och stopptider
KTH, School of Industrial Engineering and Management (ITM), Production Engineering.
2026 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
Analysis of setup and stop time (English)
Abstract [sv]

Syftet med denna studie är att identifiera ställ- och stopptider vid en linjebaserad produktion för ett företag som producerar kosmetiska produkter och aerosoler, för att sedan föreslå förbättringar. Studien är begränsad till tre produktionslinjer (9, 10 och 11) vid företaget, med en tilldelning av 400 timmar för att slutföra uppgiften. För datainsamling och bedömning valdes semistrukturerade intervjuer och observationer som metoder. Därefter sammanfattades datan genom tematisk analys varifrån de föreslagna förbättringarna härleddes i samband med SMED-principer.

Resultatet av studien presenterar bl.a förslag på förbättringar som implementering av varmvattenberedare för att effektivare kunna rengöra mellan produktskiften och vid blockage då detta vara en orsak till ställ och stopptider enligt studiens resultat. Ett ytterligare förslag är att införa snabbkopplingar för att effektivare skifta bägare för råmaterial. De föreslagna förbättringarna är anpassade efter problem vid de undersökta produktionslinorna på företaget, men kan också användas som referens för att implementera liknande lösningar på andra produktionslinor på företaget eller utanför företaget. 

Abstract [en]

The scope of this study is to identify setup and stop times at a line-based production for a company producing cosmetic products and aerosols, to then propose improvements. The study is limited to three production lines, 9, 10, and 11, at the company with an allocation of 400 hours to complete the task. For data gathering and assessment, semi-structured interviews and observations were chosen as methods. The data was then summarized through thematic analysis from where the proposed improvements were derived in conjunction with SMED principles.

The result of the study presents suggestions such as the implementation of water heaters for more efficient cleaning between product shifts and during blockages, as these were identified as causes of setup and stop times according to the study's results. An additional suggestion is to introduce quick connectors to more efficiently switch containers for raw materials. The proposed improvements are tailored to issues on production lines 9, 10, and 11 at the company, but could also be used as a reference for implementing similar solutions in other production lines at the company or outside of the company. 

Place, publisher, year, edition, pages
2026. , p. 21
Series
TRITA-ITM-EX ; 2024:382
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:kth:diva-376026OAI: oai:DiVA.org:kth-376026DiVA, id: diva2:2033647
External cooperation
Paragon Nordic
Subject / course
Industrial Business Administration and Manufacturing
Educational program
Bachelor of Science in Engineering - Mechanical Engineering
Supervisors
Examiners
Available from: 2026-01-29 Created: 2026-01-29

Open Access in DiVA

fulltext(403 kB)5 downloads
File information
File name FULLTEXT01.pdfFile size 403 kBChecksum SHA-512
6144b6c7cdd94c72c641a8838863cfa012a5fce4a45d5f94585d3a7f7e11fe44f16b6ab4cba5219a32c5158f4b2ac5c05bf54a7b939f13c2d6834dcb249b152f
Type fulltextMimetype application/pdf

By organisation
Production Engineering
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 5417 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf