kth.sePublications KTH
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Modelling construction performance variability for probabilistic time estimation of tunnelling projects
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Soil and Rock Mechanics.ORCID iD: 0000-0003-4824-420x
General Mechanic Co., Tehran, Iran.
General Mechanic Co., Tehran, Iran.
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Soil and Rock Mechanics.ORCID iD: 0000-0001-5372-7519
2025 (English)In: Georisk: Assessment and Management of Risk for Engineered Systems and Geohazards, ISSN 1749-9518, E-ISSN 1749-9526, Vol. 19, no 3, p. 497-512Article in journal (Refereed) Published
Abstract [en]

Budget overrun and schedule delay of infrastructure projects result in the mismanagement of huge amounts of resources. Studies show that accounting for uncertainties in time and cost estimation of such projects can help the decision-makers in better understanding the involved risks. Several probabilistic models have been developed during the last two decades to facilitate such estimations. A common aspect of all these models is the subjective assessment of unit activities' duration, which affects the accuracy of the estimated time and cost significantly. Despite this, the mechanism governing the variability of unit activities' duration has seldom been studied. Thus this paper focuses on addressing this gap by using a unique set of data from a tunnel project. The variability in unit activities' duration (construction performance variability) is governed by three main components: typical performance variability, minor machinery delays and minor performance delays. Using these components, a novel method for modelling construction performance variability in probabilistic time estimation of tunnelling projects is proposed. The application of the proposed method is demonstrated through a case example with a discussion on its important aspects, advantages and limitations. The findings of this paper offer a resource to improve the accuracy of time estimation for tunnelling projects.

Place, publisher, year, edition, pages
Informa UK Limited , 2025. Vol. 19, no 3, p. 497-512
Keywords [en]
activity duration, construction variability, Probabilistic approaches, production effort, time estimation
National Category
Other Civil Engineering
Identifiers
URN: urn:nbn:se:kth:diva-367188DOI: 10.1080/17499518.2024.2422496ISI: 001353218900001Scopus ID: 2-s2.0-85201014404OAI: oai:DiVA.org:kth-367188DiVA, id: diva2:1984457
Note

QC 20260127

Available from: 2025-07-16 Created: 2025-07-16 Last updated: 2026-01-27Bibliographically approved

Open Access in DiVA

No full text in DiVA

Other links

Publisher's full textScopus

Authority records

Mohammadi, MohammadSpross, Johan

Search in DiVA

By author/editor
Mohammadi, MohammadSpross, Johan
By organisation
Soil and Rock Mechanics
In the same journal
Georisk: Assessment and Management of Risk for Engineered Systems and Geohazards
Other Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 71 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf