This paper investigates consequences for the power system operation, if links are installed between Sweden and thermal dominated systems. We have applied a short term planning method to high, medium and low load scenarios. For each scenario we calculate the consequences for different combinations of extra power exchange and provision of spinning reserve. For the different cases we compare the operation cost, the possibility of using the links as intended and the number of start-ups of hydro units.